Quanzhou Sanqi Engineering Machinery Co.Ltd

enLanguage
Track Roller, Excavator Spare Parts for R60-5 R130 R200 R210-7 R290LC R320LC-7

Track Roller, Excavator Spare Parts for R60-5 R130 R200 R210-7 R290LC R320LC-7

Material:50MN
Packing:wooden pallets
guarantee time:6 months under normal usage

Product Introduction

We are concentrating on offering more personalized and relevant information about our Front Idler JS220, Track Link PC200-5 PC200-6 PC200-7 PC200-8, Idler For KOMATSU PC200-1 and thoughtful service to our customers. We have been in the forefront of the market and to ensure that in the changing market, product updates and services are ahead of the industry. The concept of responsibility for the benefit of mankind is widely recognized in the company, and our employees take it as a goal and pursuit of continuous progress. Welcoming interested businesses to cooperate with us, we look forward to owning the opportunity of working with companies around the planet for joint expansion and mutual results.

Production description

Track roller assembly also called bottom roller assembly or lower roller assembly are often in mud, water and just and bear strong impact. Therefore,they are required to be sealed reliably and wear-resisitant.

 

We will select different material as per different working condition for our track roller assembly to meet customer requirements and machine precisely and assemble them well to guarantee the hight quality.


Our advantages of lower roller assembly are as below:

 

State-of-the art machining

Each roller assembly shaft is machined by the utilization of the most modern technological advances known to the industry, Grinding and finishing methods ensure mirror like finish and tempering with medium to low frequency heat treating equipment guarantees maximum strength.

 

Maximum life

Each bottom roller assembly shell is carefully heat treated to ensure long wear life and stress resistance.

 

Precision care

Each lower roller assembly is precision machined to house special high impact low wear bimetal bushings.

Oil Leakage Inspection and Elimination

1. In the process of installation, strict inspection shall be carried out according to the technical requirements of the parts, so as to keep them clean and prevent impurities from entering the installation surface. Especially the sealing face of the sealing ring, even if there are small dust particles, it will destroy the sealing and cause oil leakage.

2. Seal sleeve and rubber ring need to be replaced for aging, deformation, scarring and rupture.

3. Spring should be replaced when its elasticity is insufficient. Its end surface is uneven and can be ground flat. When the coil is warping, it should be repaired and trimmed, and the sharp edges should be removed.

4. Large and small sealing rings are not in strict contact and can be re-grinded to make them have uniform and continuous grinding rings. Do not touch the end of the ring and disturb the spouse ring. The thickness of the ring should be the same, otherwise it must be replaced.

5. The thickness of rubber ring is not enough. It is allowed to wrap asbestos rope to achieve a tightness of/0.15-0.20 kg per square centimeter.

6. Bending of axle, non-circular or neck wear, wear of supporting wheel hub and sealing shell matching belt must be repaired.


MACHINE MODELS AVAILABLE FROM US:

FOR   DAEWOO DOOSANFOR KATO
DH55HD250
DH150HD450
DH220HD770/700
DH280-2/3HD1430/1250
DH320HD1880
DH370FOR KOMATSU
DH500PC20-5 3HOLES
DX220/DX225PC20-6 RUBBER
DX300PC20-6
FOR   CATERPILLARPC30 IF
E305.5PC20/PC30 OF
E70PC30-7/IHI30
E70B/E307/E308PC40 IF
E120BPC40-7
E200B/E320PC50UU
E215PC60-1-3
E240PC60-5/6/75/80
E322PC60-7 IF
E325PC60-7 RUBBER
E330PC100-1
E300 PC100-5
E300BPC200-1/2
E345PC200-3
FOR HITACHIPC200-5
 EX30PC300-3/EC290
EX40PC300-5/6
EX50 IFPC400
EX55/YC60FOR BULLTOZER
EX60-5D20
EX60-2/3  /UH025-3/5D31 SF WITHOUT IRON   BUSH
EX70 OFD31 DF WITHOUT IRON   BUSH
 EX70 IFD31 SF
UH045-5/UH04-3D31 DF
EX100/uh04-7D3C SF
 EX200-1/UH07-3/5/UH081/83 D3C DF
EX200-2/3/5/ZAX200/JD200D3K SF
EX300-5/LBHE944D3K DF
EX400ZAX450-3FD5C SF
ZAX270-3D5C DF
ZAX330D50 SF
ZAX450D50 DF
FOR MITSUBISHID51 SF
MS30D51 DF
MS070D60 SF
MS110-5D60 DF
MS180-3D6C SF
FOR SUMITOMOD6C DF
SH65/SH75 IFD6D SF
SH60 IFD6D DF
SH60 OFD8NSF
SH100/SH120/S265/S260D8N DF
SH120A3BD2G
LS220-3FOR OTHER MACHINES
SH200KX91-3.U30-2
SH280KX161-3/U50
SH300A3/SH350K030
SH300-5/SH340 VIO30
FOR KOBELCOVIO40
SK045 MINIVIO50-2
SK042VIO50-5
SK025SRB50
SK030IHI30
SK30IHI40
SK045IHI50
SK30 RUBBERMM35
SK55MM45/E305
SK60KH025
SK100 KH040
SK120-5KH50
SK135SRH30
SK140H45
SK200-3TB250
SK07-1YC85
SK230/SK200-6/8/CX200BFOR HYUNDAI
SK220R55
SK350R80-7
SK400R130/R150/UH04
SK300-1 R220-9 
SK300-3  R220LC
FOR JCBR200/R210-7
JS81R290
JS80R305
JS140R330
JCB200R450
FOR VOLVO
EC140
EC210/LBHE934
EC290 NEW
EC360 NEW
EC360/EC460
ZAX330
ZAX450

EXCAVATOR BOTTOM ROLLER

We warmly welcome our regular and new clients to join us for Track Roller, Excavator Spare Parts for R60-5 R130 R200 R210-7 R290LC R320LC-7. After years of hard work, we have accumulated rich experience in after-sales service. Besides, we also have a group of sales and technical personnel with excellent technology, good service and pioneering spirit. We have done every job in a down-to-earth manner, and have won the trust and support of customers step by step.

Hot Tags: Bottom Roller R210-7 For HYUNDAI, China, best, manufacturers, suppliers, factory, Track Roller R60 5, Forging Teeth, nesting system for buckets, Bottom Roller R210 7 For HYUNDAI, Carrier Roller JS200 JS210 JS220 JS330, Track Roller Volvo EC290

You Might Also Like