Quanzhou Sanqi Engineering Machinery Co.Ltd

enLanguage
Carrier Roller EX300-2 EX300-3 EX300-5

Carrier Roller EX300-2 EX300-3 EX300-5

Hardness:HRC52-58
Material:50MN
Machine type:Crawler tracked type

Product Introduction

Carrier Roller EX300-2 EX300-3 EX300-5

Production Introduction:

The carrier roller also called top roller and upper roller is to hold the track upward, so that the track has a certain degree of tension.

technical requirement TOP ROLLER EX300-2 EX300-3 EX300-5

1. All parts shall be thoroughly cleaned before assembly.

2. Before assembly, apply a small amount of butter to various rubber rings.

3. Apply a small amount of oil on the contact surface of floating seal ring.

4. After assembly, the wheel shall be able to rotate by hand, with an axial displacement of 0.3-0.85.

5. The total pressure after assembly is about 45-50kg.

6. Add gear oil sae80w-90. Lubricate about 200ml.

7. Before oil filling, use 0.4MPa air pressure for sealing

There shall be no air leakage in sealing test.

8. Bolt tightening torque: 44.1-58.8n. M.

9. Tightening torque of oil plug: 127.6-166.7n. M.


ADVANTAGES:

1. Differential type of quenching or through type of quenching heattreatment can ensure certain heat treatment hardness depth and so give good anti-cracking effects.

2. Warm forging treated roller shell gains distinguishing inner material fiber flow distribution architecture.

3.Each top rollers shaft is machined by the utilization of the most modern technological advances known to the industry, Grinding and finishing methods ensure mirror like finish and tempering with medium to low frequency heat treating equipment guarantees maximum strength.

CARRIER ROLLER EX300-2 EX300-3 EX300-5

assembly

MODELS OF CARRIER ROLLER ASSY OF HITACHI EXCAVATORS:

EX100-1EX100-2EX100-3EX100EX100M-2EX100M-3EX100M-5EX110
EX120-1EX120-5EX120-6EX130H-5EX135EX150EX150LCEX160LC-5
EX180EX200-1EX200-2EX200-3EX200-5EX200H-3EX200K-2EX200LC-3
EX200LC-5EX200LCH-3EX200LCK-2EX200LC-3EX200LC-5EX200LCH-3EX200LCK-2EX210H-5
EX215EX215EEX215LCEX220-2EX220-3EX220LC-1EX220LC-2EX220LC-3
EX220LC-5EX267EX270-5EX270LCEX270LC-2EX270LC-5EX285EX285LC
EX300-1EX300-2EX300-5EX300H-1EX300H-2EX300H-3EX300LC-1EX300LC-2
EX300LC-3EX300LC-5EX300LCH-2EX300LCH-3EX310H-3CEX350EX400-1EX400-2
EX400-5EX400H-3EX400HLCEX400LC-1EX400LC-2EX400LC-3EX400LCH-3EX450-5
EX450LC-5EX550EX550-3EX550HEX550LCEX550LC-3EX550LCHEX600H
EX600H-3EX600LCHEX700-2EX700BE-1EX700H-1EX750-5EX75UEX80-5
EX800H-5EX80LC-5EX135UEX135VR



FAQ

1. Are You A Manufacturer Or A Trader?

We are a manufacturer. We do forging and casting by ourselves. And our factory is located in Quanzhou city, Fujina, China.

2. How Could You Know If Our Parts Are Fitted To Machines?

Please offer us the detailed machine models or mounting sizes.

3. How About The Payment Terms?

TT 30 percent deposit,and TT 70percent balance after seeing the scan copy of bill of lading or LC at sight.

4. What Is The Delivery Time?

Around 30 days, and if the full order is 200 serial track roller,the lead time is from 10-15 days.


UPPER ROLLER EX300-2 EX300-3 EX300-5

Hot Tags: carrier roller ex300-2 ex300-3 ex300-5, China, best, manufacturers, suppliers, factory, Carrier Roller D31 17 D31 18, Big Excavator Carrier Roller, Mini Excavator Carrier Roller, Carrier Roller MS070, Carrier Roller PC1250, Carrier Roller PC300 5 PC300 6

You Might Also Like

(0/10)

clearall