
VIO50-6 EXCAVATOR TOP ROLLER
Type:Collar type
Hardness:HRC52-HRC58
Guarantee time:6months
Product Introduction
VIO50-6 EXCAVATOR TOP ROLLER
Production description
An excavator top roller is a key component of an excavator's undercarriage system. It is mounted on the top of the track frame and plays an important role in supporting the weight of the machine while also helping to guide the tracks.
This top roller is made up of a steel roller body and a number of bearings which ensure smooth rotation. Its primary function is to support the weight of the machine and transfer it to the tracks, while also minimizing wear and tear on the undercarriage.
The excavator top roller is a critical part of any excavator, and it is important to ensure it is properly maintained and replaced over time. This will help to improve the overall performance and lifespan of the machine, while also minimizing the risk of breakdowns and repairs.
In summary, the excavator top roller is a vital component of any excavator, and it plays an important role in ensuring the smooth operation of the machine. By focusing on proper maintenance and replacement, it is possible to optimize the performance and lifespan of the machine, while also minimizing costs and downtime.
Quick detail:
|
Origin: |
Fujian,China |
Brand |
SQ, GTR |
|
Model: |
VIO50-6 EXCAVATOR TOP ROLLER |
Hardness of trail surface |
HRC52-58 |
|
Color |
Yellow, black, gray |
Roller body material |
50MN |
|
Delivery time |
20-45days |
Warranty time |
6 months |
|
Name |
Excavator top roller group |
Machine type |
Crawler tracked excavator |
Supply ability
We can manufacture around 300000pcs of track rollers and upper rollers one month.
Packing and shipping
20gp,20 feet heavy duty,40feet containers are all acceptable.
And there are two seaports available Xiamen and quanzhou China.
Advantages
Collar
Collars of excavator roller group are made by ductile iron. It shows exceptional resisitance to shock.
The design of double-cone sealing and lubrication for life makes the roller have long life time and perfect performance under any working condition.
Precision care
Each excavator top roller assy is precision machined to house special high impact low wear bimetal bushings.
Differential type of quenching or through type of quenching heattreatment can ensure certain heat treatment hardness depth and so give good anti-cracking effects.
Sizes OF VIO50-6 EXCAVATOR TOP ROLLER

Structure OF VIO50-6 EXCAVATOR TOP ROLLER

| KOMATSU | PC05/PC07 | PC12R/PC15R | PC10-7 | PC20/30 | PC20/30(Rubber Tracks) |
| PC50MR-2 | PC56 | PC75-3 | PC75UU/PC78 | PC60-6(Rubber Tracks) | |
| PC60-6 | PC60-7 | PC60-5 | PC200-7 | PC220/240-7(Large) | |
| PC300-8 | PC400-3/5 | PC400-6 | PC400-7 | PC650-5 | |
| PC20R-8 | PC30MR-1 | PC40/45 | PC40MR | ||
| PC100-/3/5 | PC120-3 | PC200-5 | PC200-3 | ||
| PC300-3 | PC300-5 | PC300-6 | PC300-7 | ||
| PC1000-1 | |||||
| HITACHI | EX08 | EX12/15 | EX30-1 | EX30-2 | EX55/ZX55/ZAX60 |
| EX60-2/3 | EX300-5/EX350 | EX70/75 | EX90-1 | ZAX330-3(electronic injection) | |
| EX220-/1 | EX270-1/EX300-1 | EX400-1 | EX400-3/5 | EX100M-1/EX150-1 | |
| EX40-1 | EX40-2 | EX50 | EX60-1 | ||
| EX100-2/5 | EX200-1 | EX200-2 | EX200-5 | ||
| EX100-1 | EX60-5 | VOLVO360 | |||
| HYUNDAI | R55-7 | R60-5 | R60-7 | R130 | R250/R290/R320 |
| R225-7 | R290LC-7 | R360LC-7 | R450 | ||
| CATERPILLAR | E303 | E120B/E110/E120 | E312 | E55/E305.5 | E70B/(Bilateral) |
| E240 | E300B | E300 | E322 | E325 | |
| E200B/E320 | E200B | E323 | E324 | ||
| E330 | E450 | ||||
| KOBELCO | SK020SR | SK024/SK025 | SK035SR | SK045SR | SK330-6.8 |
| SK100/120 | SK060/SK75 | SK120-W | SK07-1 | SK400-3/SK450/SK460 | |
| SK200-/3/5 | SK045(10tons) | SK200-6 | SK200-8 | ZAX330-3(electronic injection) | |
| SK260/SK250-8 | |||||
| SK030 | SK042-1 | SK042-2 | SK045 | ||
| SK07-2 | SK07N2 | SK300 | SK300-5 | ||
| SK220-3 | SK220-5 | SK310 | SK320 | ||
| SUMITOMO | SH30 | SH55/SH65 | SH60 | SH100/SH120 | SH120-A3 |
| SH300-2 | SH300-3 | SH300-1 | SH350 | SH280 | |
| SH340 | LS3400FJ2 | LS5800FJ2 | LS3400FJ2 | ||
| SH200 | SH200 | SH220 | SH300-1 | ||
| SH430 | SH580 | LS2600FJ2 | LS2800FJ2 | ||
| DAEWOO | DH55 | DH60 | DH80 | DH150 | DH180/200/220 |
| DH450 | DH360/370/400/420 | ||||
| DH280-3 | DH258 | DH300 | |||
| KATO | HD140 | HD250 | HD308 | HD400-1 | HD400-2 |
| HD820 | HD1250 | HD1250-7 | HD1430 | HD1880 | |
| HD770 | HD450 | HD550 | HD700/770 | ||
| HE280 | |||||
| YUCHAI | YC18 | YC35 | YC60 | YC85 | YC135 |
| KUBOTA | U15-3 | U30-2 | U40-2 | U50 | U85 |
| YANMAR | VIO30-2 | VIO40-2/B50 | VIO50/55 | K030 | H45 |
| MITSUBISHI | MS110-5 | MS110-5 | MS230 | ||
| VOLVO | EC55 | EC210 | EC290 | EC360 | EC460 |
| IHISCE | IHI30 | IS35 | IHI45J | IHI50J | MM45T |
| 龙工60 | SWE50 | SWE70 | |||
| SY55 | SY215(375) | SY215(370) | 柳工922 | ||
| FIAT | FH150 | FH200-3 | FH220-3 | FH300 | FH330 |
| SAMSUNG | SE130 | SE210-3 | |||
| Crawler Crane | HD408 | SD08 | 2100 | 601 LS120 | LS108 |
| LS108 | SMTL | 7055 | GLT240 | IHI400 | |
| KH125 | KH125310 | KH180-1 | KH180-3 | ||
| KH150 | ED4000 | GLT118 | EDSC6 | ||
| IHI200 | IHI500 | KH100D | KH100-3 | ||
| KOMATSU/CAT/Bulldozers Series | |||||
| BD2G | D20 | D31-15/16 | D31-17/18/20 | D31-15/16 | D31-17/18/20 |
| D80-12 | D85-18 | D155-1 | D155-5 | D275A-5 | D355 |
| D6H | D3C | D4 | D4D | D5 | D6D |
| D41A-6 | D50 | D60 | |||
| D4D | D5 | D6D | D6H | ||
| D6H | D7 | D7G | |||
Technical requirements:
1: Before assembly, all parts shall be inspected and cleaned separately;
2: During assembly, the assembly size shall be ensured;
3: The sealing surface of shaft sleeve, shaft and floating seal ring shall be coated with lubricating oil;
4: The contact surface between O-ring and floating seal ring shall be free of lubricating oil,
The O-ring assembly shall be free of distortion;
5: After assembly, ensure that the wheel body can be rotated by hand without jamming;
6: After assembly, pressure test and oil filling shall be carried out;
7: After assembly, polish, polish and remove welding slag.

FAQ
1. How Could You Know If Our Parts Are Fitted To Machines?
Please offer us the detailed machine models or mounting sizes.
2. What Is The Delivery Time?
Generally speaking, the delivery time is 20days to 45days.it depend on how many items for a order. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is within 10days.
3. Could You Make Customer Logo?
Yes,we can make customer logos if it reach the moq for customer logo order.
Hot Tags: vio50-6 excavator top roller, China, best, manufacturers, suppliers, factory, Front Idler D31, Front Idler EX100 1 EX120 1, Bulldozer Track Rollers, Mini Digger Front Idler, Sprocket Segments, Digger Track Rollers
You Might Also Like
Send Inquiry







