
VIO55-6 EXCAVATOR TOP ROLLER
Carrier roller type:Collar type
Material:50mn
Guarantee time:6months
Product Introduction
VIO55-6 EXCAVATOR TOP ROLLER
An excavator top roller is a crucial component in an excavator machine that is responsible for stabilizing the excavator's track and ensuring its smooth movement. The top roller is located at the top of the undercarriage near the front of the machine and is designed to help distribute the weight of the excavator more efficiently.
This part is typically made of high-quality materials like hardened steel or aluminum that are made to withstand harsh environmental conditions and heavy workloads. It ensures that the track operates smoothly, preventing potential damage from rocks, debris, or other obstructions.
Without the proper function of an excavator top roller, an excavator would not be able to move effectively, leading to potential damage to the machine and lower productivity. Therefore, it is essential to choose top rollers made of high-quality materials and to maintain the machine regularly.
In conclusion, an excavator top roller is a critical component in an excavator's undercarriage system. Investing in a quality top roller can ensure the durability and long life of your excavator.
Quick detail:
|
Origin: |
Fujian,China |
Brand |
SQ, GTR |
|
Model: |
VIO55-6 EXCAVATOR TOP ROLLER |
Hardness of trail surface |
HRC52-58 |
|
Color |
Yellow, black, gray |
Roller body material |
50MN |
|
Delivery time |
20-45days |
Warranty time |
6 months |
|
Name |
Excavator carrier roller |
Machine type |
Crawler tracked excavator |
Sizes of VIO55-6 EXCAVATOR TOP ROLLER

Structure of VIO55-6 EXCAVATOR TOP ROLLER

Advantages
Bimetal bushing
Bimetal bushing of our excavator top rollers is based on steel plate which special alloy is sintered on it. It shows high loading ability and high ability of fatigue resistance.
Floating seal group
Floating seal group of our excavator upper rollers has super seal performance under bad working conditions like being muddy or steamy etc.. it is applicable for the condition of low speed and heavy load. And it is anti-friction and can be auto-compensated after wearing.
Lubrication oil
Lubrication oil of our excavator upper rollers is selected carefully. It can lubricate shaft and bushing well to lower the wearing utmostly. And it can cool the roller perfectly. Those maximize the inner structure life.
Other more detailed information of excavator top rollers:
|
MODEL |
VIO55-6 EXCAVATOR TOP ROLLER |
|
Machine weight range |
1.5t to 95.3t |
|
Material |
ductile iron for carrier roller collars |
| 45#,50MN or 40MN2 for carrier roller assy bodies | |
| 45# for carrier rollerassy shafts | |
|
Manufacturing method |
Forging,casting,machining,assembly,painting |
|
Packing |
Fumigated wooden pallets,polywood pallets |
|
Port of shipment |
Xiamen |
|
OEM and ODM |
Acceptable |
|
Payment term |
TT and LC |
Packing
9pcs per pallet,several pallets as a pile up to the weight around 3t
12pcs per pallet, several pallets as a pile up to the weight around 3t
15pcs per pallet, several pallets as a pile up to the weight around 3t
20pcs per pallet, several pallets as a pile up to the weight around 3t

Wooden case for mini excavator top roller

| MODELS FOR TRACK ROLLERS AVAILABLE FROM US. | |||||
| KOMATSU | PC05/PC07 | PC12R/PC15R | PC10-7 | PC20/30 | PC20/30(Rubber Tracks) |
| PC50MR-2 | PC56 | PC75-3 | PC75UU/PC78 | PC60-6(Rubber Tracks) | |
| PC60-6 | PC60-7 MF/IF | PC60-5 | PC200-7 | PC220/240-7(Large) | |
| PC300-8 | PC400-3/5 | PC400-6 | PC400-7 | PC650-5 | |
| PC20R-8 | PC30MR-1 | PC40/45 | PC40MR | ||
| PC100-/3/5 | PC120-3 | PC200-5 | PC200-3 | ||
| PC300-3 | PC300-5 | PC300-6 | PC300-7 | ||
| PC1000-1 | |||||
| HITACHI | EX08 | EX12/15 | EX30-1 | EX30-2 | EX55/ZX55/ZAX60 |
| EX60-2/3 | EX300-5/EX350 | EX70/75 | EX90-1 | ZAX330-3(electronic injection) | |
| EX220-/1 | EX270-1/EX300-1 | EX400-1 | EX400-3/5 | EX100M-1/EX150-1 | |
| EX40-1 | EX40-2 | EX50 | EX60-1 | ||
| EX100-2/5 | EX200-1 | EX200-2 | EX200-5 | ||
| EX100-1 | EX60-5 | VOLVO360 | |||
| HYUNDAI | R55-7 | R60-5 | R60-7 | R130 | R250/R290/R320 |
| R225-7 | R290LC-7 | R360LC-7 | R450 | ||
| R200/R200L | R80 | R200-3 | R210LC-7 | ||
| CATERPILLAR | E303 | E120B/E110/E120 | E312 | E55/E305.5 | E70B/(Bilateral) |
| E240 | E300B | E300 | E322 | E325 | |
| E200B/E320 | E200B | E323 | E324 | ||
| E330 | E450 | ||||
| KOBELCO | SK020SR | SK024/SK025 | SK035SR | SK045SR | SK330-6.8 |
| SK100/120 | SK060/SK75 | SK120-W | SK07-1 | SK400-3/SK450/SK460 | |
| SK200-/3/5 | SK045(10tons) | SK200-6 | SK200-8 | ZAX330-3(electronic injection) | |
| SK260/SK250-8 | |||||
| SK030 | SK042-1 | SK042-2 | SK045 | ||
| SK07-2 | SK07N2 | SK300 | SK300-5 | ||
| SK220-3 | SK220-5 | SK310 | SK320 | ||
| SUMITOMO | SH30 | SH55/SH65 | SH60(D) | SH60(S) | SH100/SH120(S) |
| SH220(D) | SH300-1(S) | SH300-1(D) | SH100/SH120(D) | ||
| SH350 | SH280 | SH340(S) | SH340(D) | SH430(S) | |
| LS2800FJ2 | LS3400FJ2 | LS5800FJ2 | |||
| SH120-A3 | SH200(S) | SH200(D) | SH220(S) | ||
| SH300-3(S) | SH300-3(D) | SH300-2(S) | SH300-2(D) | ||
| SH430(D) | SH580(S) | SH580(D) | LS2600FJ2 | ||
| DAEWOO | DH55 | DH60 | DH80 | DH150 | DH180/200/220 |
| DH450 | DH360/370/400/420 | ||||
| DH280-3 | DH258 | DH300 | |||
| KATO | HD140 | HD250 | HD308 | HD400-1 | HD400-2 |
| HD820 | HD1250 | HD1250-7 | HD1430 | HD1880 | |
| HD770 | HD450 | HD550 | HD700/770 | ||
| HE280 | |||||
| YUCHAI | YC18 | YC35 | YC60 | YC85 | YC135 |
| KUBOTA | U15-3 | U30-2 | U40-2 | U50 | U85 |
| YANMAR | VIO30-2 | VIO40-2/B50 | VIO50/55 | K030 | H45 |
| MITSUBISHI | MS110-5 | MS110-5 | MS230 | ||
| VOLVO | EC55 | EC210 | EC290 | EC360 | EC460 |
| IHISCE | IHI30 | IS35 | IHI45J | IHI50J | MM45T |
| 龙工60 | SWE50 | SWE70 | |||
| SY55 | SY215(375) | SY215(370) | LG922 | ||
| FIAT | FH150 | FH200-3 | FH220-3 | FH300 | FH330 |
| SAMSUNG | SE130 | SE210-3 | |||
| CRANE | HD408 | SD08 | 2100 | 601 LS120 | LS108 |
| LS108 | SMTL | 7055 | GLT240 | IHI400 | |
| KH125 | KH125310 | KH180-1 | KH180-3 | ||
| KH150 | ED4000 | GLT118 | EDSC6 | ||
| IHI200 | IHI500 | KH100D | KH100-3 | ||
| KOMATSU/CAT/Bulldozers Series | |||||
| BD2G S/F | BD2G D/F | D20 S/F | D20 D/F | D31 D/F-15/16 | D31 S/F-17/18/20 |
| D4 S/F | D4 D/F | D4D S/F | D4D D/F | D50 S/F | D50 D/F |
| D60 S/F | D60 D/F | D6H S/F | D6H D/F | D7 S/F | D7 D/F |
| D85-18 S/F | D85-18 D/F | D155-1 S/F | D155-1 D/F | D155-5 S/F | D155-5 D/F |
| D60/D65-8 S/F | D60/D65-8 D/F | D275A-5 S/F | D275A-5 D/F | ||
| D3C S/F | D3C D/F | D41A-6 S/F | D41A-6 D/F | ||
| D5 D/F | D5 S/F | D6D S/F | D6D D/F | ||
| D7G S/F | D7G D/F | D80-12 S/F | D80-12 D/F | ||
| D355 S/F | D355 D/F | D65EX-12 S/F | D65EX-12 D/F | ||
FAQ
1. How Could You Know If Our Parts Are Fitted To Machines?
Please offer us the detailed machine models or mounting sizes.
2. What Is The Delivery Time?
Generally speaking, the delivery time is 20days to 45days.it depend on how many items for a order. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is within 10days.
3. What's The Qualify Assurance We Provided And How Do We Control Quality?
1). Established a procedure to check products at all stages of the manufacturing process from raw materials to final products. Beside, we have also developed a procedure which identifies the inspection and test status of all items at all stages of the manufacturing process.
2).100% inspection in assembly lines. All controls, inspections,equipment,fixtures,total production resources and skills are inspected to ensure they consistently achieve the required quality levels.
Hot Tags: vio55-6 excavator top roller, China, best, manufacturers, suppliers, factory, Track Link PC300 6 PC300 7 PC300 8, Harvester Drive Sprockets, Sprocket Rim JS140, Front Idler Dx300, Mini Track Roller B50, Front Idler MS070
You Might Also Like
Send Inquiry







