172460-37061 Excavator Front Idler Assy

172460-37061 Excavator Front Idler Assy

bracket type,not bracket type
rockbush type,non rock bush type
forgeing shaft type,not forging shaft

Product Introduction

bulldozer idler roller
 
172460-37061 excavator front idler assy
 

Excavator front idler assembly refers to the key component of an excavator that supports and guides the track chain. It is a crucial part of excavator control and stability during operation. In simple terms, the excavator front idler assembly can be described as a device that manages the tension and slack of the undercarriage of the excavator.

This vital component is made up of various parts, including the inner and outer bushing, the front idler shell, and the seal. Functioning together, these parts provide the necessary control and stability to the excavator.

The excavator front idler assembly has an important role in minimizing the vibration and increasing the durability of the machine. Without a properly functioning front idler assembly, the efficiency and safety of the excavator could be compromised.

In conclusion, understanding the definition of excavator front idler assembly is essential to maintaining the effective operation of an excavator. Therefore, it is important to make sure that this component is regularly inspected and replaced when necessary.

 

features

The heavy profiles of idler roller rims are carefully heat treated in depth for extra service life.

mission

We supply high quality 172460-37061 excavator front idler assy at reasonable prices.

system of values

Leadership, speed, service, sharing, passion, positivity, curiosity.

company philosophy

Pioneering, innovating, breaking through, creating

idler machining

Advantages

1. Good metal fibrous tissue and special heat treatment brings them longer life.

2. Resist abrasion and impact well; Prevent fragmentation well.
3. Using low and high-double seal makes it life lubrication

4. High flexibility and hydrocarbon-type regulator which is avaiable for mine working condition.

 

idler casting

Technical requirement

1. Check all parts strictly before assembly and clean them

2. A small amount of oil shall be applied to the mating surface of the shaft sleeve and straight shaft before assembly

3. The floating oil seal ring shall be assembled in pairs, and its sealing surface shall be coated with lubricating oil. O-ring and floating oil seal ring

The contact surface shall not be coated with grease, and the assembly of floating seal rubber ring shall not be twisted

4. During assembly, pay attention to the oil groove direction of the shaft and the installation plane of the side cover

5. After assembly, ensure that the axial clearance is 0.4-0.7mm. Rotate the wheel body by hand, and feel the resistance moment, but there is no jamming,

6. After installation, fill in the filtered lubricating oil and check that there is no leakage. Then run in for 3-5 minutes to make it run smoothly

7. The painting color shall comply with jb2299-78 or the customer's requirements

 

idler heattreatmnet

FAQ

1. Packaging?
Packed on fumigating pallet with steel strip.

2. What Is Your Sample Policy?
We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

3. What Is Your Terms Of Delivery?
FOB, CNF.CIF

Hot Tags: 172460-37061 excavator front idler assy, China, best, manufacturers, suppliers, factory, Carrier Roller PC200 7 PC220 7, Track Roller E70, Front Idler HD720, Excavator Track Roller, Boom Cylinder Assy, Track Roller D8N

You Might Also Like

(0/10)

clearall