Quanzhou Sanqi Engineering Machinery Co.Ltd

enLanguage
60003638 Excavator Idler

60003638 Excavator Idler

Machine type:Crawler tracked excavator
Material:ZG50MN
Guarantee:6months

Product Introduction

60003638 excavator idler

 

Production informaton:

We offer a wide range of idler for the most popular models.our excavator idler assy are engineered with casting alloy steel which is through a proper heat treatment allowing durability and impact. Our excavator idler groups are highly praised in the market as a product with impact resistance and a long life.

Structure of 60003638 excavator idler:

FRONT IDLER

Maching of 60003638 excavator idler:

IDLER ROLLER MACHINING WORKSHOP

casting of 60003638 excavator idler:

idler casting

Main Features of 60003638 excavator idler

1) Good metal fibrous tissue and special heat treatment brings them longer life.

2) Resist abrasion and impact well; Prevent fragmentation well.
3) Using low and high-double seal makes it life lubrication

4) High flexibility and hydrocarbon-type regulator which is avaiable for mine working condition.

 

Our quality control procedures

1. When raw material come inside our factory,we need to test the material composition first.

2. We need to analyze the composition of the first furnace of the steel liquid every day.

3. After several pcs of parts are heattreated, we need to check the hardness before all to be done to guarantee the hardness.

4. Our inspectors will check the sizes when parts are being machined and parts are being assembled.

 

Our services

 

Pre-sale Service
Excavator spare parts in full-scale are available
100% quality assurance,develop and manufacture follow original ones
Quick response within 24 hours

 

Sale Service
Small order allowed
Reasonable Price and timely delivery
Original packing, neutral packing or customized packing

 

After -Sales
Servicel Positive customer feedback from abroad market
Excellent After-sales service

Cross Models:

EX30,EX30-1,EX30-2,EX30U

Cross Part Numbers:

60003638

9134397

9314258

FAQ

1. How Can You Control Your Quality?

When material come inside our factory, we need to analyze the material cost. And when front idlers and sprocket rims material are casted. We need to analyze the composition to see if the material is qualified or not. When track rollers, carrier rollers and front idlers are being assembled, we need to oil leakage testing. After several parts are heat treated, we need to check the hardness before all are done.And our inspectors will check the sizes at ramdom when parts are being machined or assembled. All of these can guarantee the parts with correct sizes and good quality.

2. What Is The Delivery Time?

Generally speaking, the delivery time is 20days to 45days.it depend on how many items for a order. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is within 10days.

3. What Is MOQ For The Order?

Generally speaking, the MOQ is a full container load of 20 feet container. Under this condition, the single cost can be lowered. if customers ask for less full container load. It is also acceptable.

 

Hot Tags: 60003638 excavator idler, China, best, manufacturers, suppliers, factory, Front Idler D7F, Front Idler Group, Front Idler ZAX870, Bulldozer Idler Roller Group, Big Excavator Idler Group, Front Idler EX40

You Might Also Like

(0/10)

clearall