Quanzhou Sanqi Engineering Machinery Co.Ltd

enLanguage
Big Excavator Idler Group

Big Excavator Idler Group

We offer a wide range of big excavator idler group for the most popular models.our big excavator idler assy are engineered with casting alloy steel which is through a proper heat treatment allowing durability and impact.

Product Introduction

Production introduction

We offer a wide range of big excavator idler group for the most popular models.our big excavator idler assy are engineered with casting alloy steel which is through a proper heat treatment allowing durability and impact. Our excavator idler groups are highly praised in the market as a product with impact resistance and a long life.

Every machine needs regular inspection and maintenance. Selecting high-quality excavator front idler group will save costs on the long run. Our specialist knowledge of excavator front idler enables us to always give you good advice and to guarantee the quality and long service life of our front idler.


Quick detail:

Origin:

Fujian,China

Brand

SQ, GTR

Model:

PC650-8

Hardness of trail surface

HRC52-58

Color

Yellow, black, gray

Roller body material

50MN

Delivery time

20-45days

Warranty time

6 months

Term

FOB,CNF,CIF

Machine type

Crawler tracked excavator


Stucture


详情图 1 big excavator idler group


Sizes


详情图 2 big excavator idler assy


Other more detailed information are as below excel file:

Applicable pitch range

90 to 317.5

Material

ZG50MN or 35SIMN

Manufacturing method

casing ,heat treatment,lathing,drilling,painting

Color

Yellow, black etc..

Packing

pallets

Delivery time

from 30 days to 45 days

Port of shipment

Xiamen

guarantee time

6 months

OEM and ODM

Acceptable

Payment term

TT

LC at sight

Features

1. Each front idler is produced using dished out quality steel plates of generous thickness for maximum strength. An abundance of internal reinforcements sage guard shape is against twist from severe usage such as ripping.

2. Maximum strength

The idler shaft is machined by the utilization of the most modern technological advances known to the industry. Grinding and finishing methods ensure a mirror like finish and tempering with medium to low frequency heat treating equipment guarantees maximum strength.

3 . Cost saving service life

The heavy profiles of idler rims are carefully heat treated in depth for extra service life.

4. Precision care

Each idler is precision machined to house special high impact low wear bimetallic bushings.



Attentions while assembling the rollers

1. Before assembling rollers,smooth the sharp part of sapre parts and do the deburring,clean the inner holes of the roller body and oil seal etc..

2. Do not break and scratch any part of the sealing parts.

3. Do not oil and distort the rubber floating seal ring during assembling the rollers.

4. A small amount of oil should be covered on the contacting surface while fitting the floating seal group.

5. After finishing the assembling process,fill clean extreme-pressure vehicle gear oil to take 80 percent of the inner cavity of roller body and do the running test then confirm no leakage after 4 hours.


详情图 4 big excavator front idler


Our excavator idler assy are applicable to below models:

KOMATSU

PC05 PC07 PC12R PC15R PC10-7 PC20-3 PC20-5 PC20-6 PC20-6RUBBER PC20R-8 PC30MR-1 PC30-7 PC40-7 PC40-7RUBBER PC45 PC40MR PC50MR-2 PC50 PC50UU PC56 PC60-5 PC60-6 PC60-7 PC75-3 PC75UU PC78 PC100-1 PC100-3 PC120-5 PC130-7 PC138 PC150 PC200-1 PC200-3 PC200-5/6/7/8 PC300-3PC300-5/6/7/8 PC400-3 PC400-5/6/7/8 PC650-5 PC650-8 PC750 PC800 PC1000-1 PC1250-8

We don’t list out all items.If any more item you need,please feel free to contact with us.


FAQ

1. What is the percent of your parts for overseas market?

70percent of our parts are for overseas market.

2. Is there any guarantee of your parts?

There are 6 months guarantee time for excacavar parts under normal working conditions and 3months guaranteet tiem for bulldozer parts under normal working conditions.

3. How do you offer guarantee?

If parts are broken due to manufacturing problem, we will deduct the value for next order amount or offer you brand new one to replce.

4. Could you make customer logo?

Yes,we can make customer logos if it reach the moq for customer logo order.


Hot Tags: big excavator idler group, China, best, manufacturers, suppliers, factory, Front Idler U15, Front Idler JS220, Front Idler D155 3, Front Idler EX60 1, Front Idler MS120 8, Front Idler H45

You Might Also Like

(0/10)

clearall