Quanzhou Sanqi Engineering Machinery Co.Ltd

enLanguage
Ex300-5 Excavator Idler

Ex300-5 Excavator Idler

Guarantee:6mongths
Material:ZG50MN
Hardness:HRC48-HRC56

Product Introduction

ex300-5 excavator idler

Production introduction:

The guide wheel is used to guide the track to rotate correctly to prevent its deviation and derailment.            

Most excavators also act as supporting wheels. This can increase the contact area between the track and the ground and reduce the grounding voltage.            

The wheel surface of the guide wheel is made into a smooth surface, and the middle arm ring acts as the guide, while the torus on both sides supports the rail chain.            

The smaller the distance between the guide wheel and the nearest supporting wheel, the better the guidance.         

Material: ZG50MN, casting, tempering, hardness HRC48-HRC56           

Main points:            

In order to make the guide wheel work and prolong its life, the radial runout of the wheel face on the central hole should be less than or equal to 3MM, and the correct alignment should be made when the wheel is installed.

 

Structure of ex300-5 excavator idler:

FRONT IDLER

ex300-5 excavator idler MACHINING:

IDLER ROLLER

ex300-5 excavator idler HEAT TREATMENT:

IDLER SPROCKET HEATTREATMENT

ex300-5 excavator idler PACKING:

IDLER GROUP

 

 

Advantages

1. Good metal fibrous tissue and special heat treatment brings them longer life.

2. Resist abrasion and impact well; Prevent fragmentation well.
3. Using low and high-double seal makes it life lubrication

4. High flexibility and hydrocarbon-type regulator which is avaiable for mine working condition.

Attentions while assembling the Front idler rollers

1. Before assembling rollers,smooth the sharp part of sapre parts and do the deburring,clean the inner holes of the roller body and oil seal etc..

2. Do not break and scratch any part of the sealing parts.

3. Do not oil and distort the rubber floating seal ring during assembling the rollers.

4. A small amount of oil should be covered on the contacting surface while fitting the floating seal group.

5. After finishing the assembling process,fill clean extreme-pressure vehicle gear oil to take 80 percent of the inner cavity of roller body and do the running test then confirm no leakage after 4 hours.

FAQ

1. What Are Main Factors That Effect Your Price?

Price is effected by main factors below:

1) Order quantity: the bigger quantity, the better price.

2) Raw steel price: if raw materials price is stable, our price is stable.

3) USD/RMB exchange rate.

4) Size: if it is regular size, price is regular. If not, price is based on size detail.

5) Length: to make your cost down, we suggest honed tubes length be unfixed 4 to 6 meter range. For chrome plated bars, we suggest length be fixed 3 or 6 meter.

The suggested length is mainly decided by raw materials length.

For example, if you need chrome plated bars length 4.5 meter, price is higher than the chromed bars with length 6 meter because the raw steel bar length is 6 meter. If we produce 4.5 meter, 1.5 meter length of the chrome plated rods will be wasted

2. What Is The Payment Term? How Can We Trust You And Make Payment?

Normal payment is by T/T. Payment by LC can be negotiated.

We have exported to more than 30 Countires and provided service for more than 100 customers. We are 9-Year certified golden supplier so far in Alibaba. So cooperating with us is very safe.

3. Can I Have A Visiting To Your Factory Before The Order?

Welcome to visit us. Pls make an appointment in advance. It is necessary to send visiting schedule and meeting details so that we can prepare and arrange.

 

 

Hot Tags: ex300-5 excavator idler, China, best, manufacturers, suppliers, factory, Track Crane Idler, Front Idler D65 12 D85ESS 2, Mini Digger Front Idler, Front Idler KX91 3, Front Idler D61PX 12, Idler For CATERPILLAR E307

You Might Also Like

(0/10)

clearall