Quanzhou Sanqi Engineering Machinery Co.Ltd

enLanguage
Front Idler B50

Front Idler B50

Hardness:HRC48-HRC56
Material:ZG50MN
Color:Black or customerized

Product Introduction

FRONT IDLER B50

Production introduction:

The guide wheel is used to guide the track to rotate correctly to prevent its deviation and derailment.            

Most excavators also act as supporting wheels. This can increase the contact area between the track and the ground and reduce the grounding voltage.            

The wheel surface of the guide wheel is made into a smooth surface, and the middle arm ring acts as the guide, while the torus on both sides supports the rail chain.            

The smaller the distance between the guide wheel and the nearest supporting wheel, the better the guidance.         

Material: ZG50MN, casting, tempering, hardness HRC48-HRC56           

Main points:            

In order to make the guide wheel work and prolong its life, the radial runout of the wheel face on the central hole should be less than or equal to 3MM, and the correct alignment should be made when the wheel is installed.


Structure of front idler b50:

FRONT IDLER

idler roller b50 casting:

idler roller body

idler group b50 machining:

idler roller machining

idler assy b50 heat treatment:

IDLER SPROCKET HEATTREATMENT


Advantages

1. The idler body is a casting part, and the idler body has durability and rust resistance after special heat treatment.

2. Good sealing guarantees the serveise life of the idler.

3. The idler section shows the hardness of the Idler body diameter, and the design of the idler shaft and the outer diameter gap is reasonable, which increase the wear life.

4. The cross section shows the hardness and lubrication clearance of the lead shaft.

5. Leading shaft, copper bushing and sealing parts, all parts are passed through the fully automatic production system, and the presion is controlled by the numerical control computer to ensure the reliability.



models for front idler as below:

vio15-1vio15-2vio20-1vio20-2vio30-1vio30-2vio35vio40-2
vio50vio55vio55-2vio55-6vio70vio75vio80B19
B19-3B27-3B37-2B50B70vio35-2

FAQ

1. How could you know if our parts are fitted to machines?

Please offer us the detailed machine models or mounting sizes.

2. What is the delivery time?

Generally speaking, the delivery time is 20days to 45days.it depend on how many items for a order. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is within 10days.

3. Could you make customer logo?

Yes,we can make customer logos if it reach the moq for customer logo order.

Hot Tags: front idler b50, China, best, manufacturers, suppliers, factory, Front Idler UH063, Bulldozer Idler Roller Group, Front Idler SK030SR, Excavator Idler Group, Excavator Front Idler Assy, Front Idler HD720

You Might Also Like

(0/10)

clearall