
Product Introduction
Front Idler PC30
Production introduction:
Idler: to guide the track, located at the end opposite to the driving sprocket. Usually, there are two excavators.
Structure of front idler pc30:

Painting of idler roller pc30

machining of idler group pc30

Advantages of idler assy pc30
1. The idler body is a casting part, and the idler body has durability and rust resistance after special heat treatment.
2. Good sealing guarantees the serveise life of the idler.
3. The idler section shows the hardness of the Idler body diameter, and the design of the idler shaft and the outer diameter gap is reasonable, which increase the wear life.
4. The cross section shows the hardness and lubrication clearance of the lead shaft.
5. Leading shaft, copper bushing and sealing parts, all parts are passed through the fully automatic production system, and the presion is controlled by the numerical control computer to ensure the reliability.
Factory Advantages:
1). Materials
Our company purchases steel from some large steel groups, such as Shanghai Baoshan Steel Mill, Beijing ShouGang Group, Hangzhou Steel Mill, who provide steel with not only good mechanical properties but stability of chemical component to make sure of the high strength of parts.
2). Manufacture Procession
First, we have already owned High-precision Digital Machining Center for mould making in special Mould Workshop, which decides the high quality of mould.
Second, heat treatment is utilized. We adopt the Controlled-atmosphere Automatic Heat Treatment Furnace to guarantee the good quality and stability of our parts.
3). The total quality control system
We have established a total quality control system which means we perform quality control from buying raw materials to different machining procession and to final packing. We have many high-tech testing instruments, such as Torsion Tester, Peel Force Tester and Metallographic Microscope and etc. which determine the excellent quality and appearance of our products.
Models of idler assy:
| KOMATSU | |||||||
| PC20UU | PC30UU | PC40UU | PC50UU | PC75UU | PC30-1 | PC30-7 | PC30MR |
| PC20-3 | PC20-5 | PC20-6 | PC75-3 | PC100-3 | PC71 | PC90 | PC100-1 |
| PC20-7 | PC20 | PC30-3 | PC30-5 | PC30-6 | PC40-5 | PC40-6 | PC40-7 |
| PC45 | PC45-2 | PC50 | PC55 | PC60-1 | PC60-3 | PC60-5/6 | PC60-7 |
| PC75 | PC80 | PC100-5 | PC120-2 | PC120-6 | PC130 | PC130-7 | PC200 |
| PC200-1 | PC200-2 | PC200-3 | PC200-5/6 | PC200-7 | PC200-8 | PC210-6 | PC220-1 |
| PC220-3 | PC220-6 | PC220-7 | PC220-8 | PC240-3 | PC270-7 | PC202B | PC220LC-6 |
| PC220LC-8 | PC240 | PC300 | PC300-3 | PC300-5/6 | PC300-7 | PC300-7K | PC300LC-7 |
| PC350-6/7 | PC400 | PC400-3 | PC5400-5 | PC400-6 | PC400LC-7 | PC450-6 | PC450-7 |
| PC600 | PC650 | PC750 | PC800 | PC1000-1 | PC1100 | PC1250 | PC2000 |
FAQ
1. Are you a manufacturer or a trader?
We are a manufacturer. We do forging and casting by ourselves. And our factory is located in Quanzhou city, Fujina, China.
2. How could you know if our parts are fitted to machines?
Please offer us the detailed machine models or mounting sizes.
3. How about the payment terms?
TT 30 percent deposit,and TT 70percent balance after seeing the scan copy of bill of lading or LC at sight.
4. What is the delivery time?
Generally speaking, the delivery time is 20days to 45days.it depend on how many items for a order. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is within 10days.
Hot Tags: front idler pc30, China, best, manufacturers, suppliers, factory, Front Idler PC200 2, Front Idler KX161 3, Front Idler EX100 2 EX100 3 EX100 5, Front Idler D6H, Front Idler MS180 3 MS180 8, Front Idler D61PX 12
You Might Also Like
Send Inquiry







