Quanzhou Sanqi Engineering Machinery Co.Ltd

enLanguage
PC650-6 Excavator Idler

PC650-6 Excavator Idler

Each front idler is produced using dished out quality steel plates of generous thickness for maximum strength. An abundance of internal reinforcements sage guard shape is against twist from severe usage such as ripping.

Product Introduction

PC650-6 excavator idler

 

An idler of an excavator is an essential part that helps to support and guide the tracks of the machine. It is fundamental for the excavator to move smoothly and efficiently while digging trenches, loading material, or carrying out any other tasks.

The idler is positioned at the front end of the undercarriage, and its primary function is to keep the track tension consistent while the excavator is in motion. As the machine moves, the idler's rotating wheel helps to support the tracks, reduce vibration, and prevent derailment.

The importance of maintaining the idler cannot be overstated. Regular inspections and maintenance can help to detect any wear and tear or damage to the idler and ensure it is replaced promptly. Ignoring this critical part can result in track problems, leading to expensive repairs, and posing safety hazards.

In summary, the idler of an excavator may seem like a small component, but it plays a significant role in the overall performance and safety of the machine. As such, it is critical to ensure the idler is always in optimal condition to avoid any issues during operation.

Product details

Part name: Shovel front idler group

Material: Steel 50Mn

Finishing: Smooth

Technique: Forging or casting

Standard: ISO

Place of origin: Fujian,China

Brand name: SQ or GTR

Color: Black,yellow or gray

Surface hardness: HRC-52-HRC58

Heat treatment depth: 8-12mm

Moving type: Crawler-tracked excavator

Delivery time: 30-45 days after receiving the advance payment or receiving LC

Packing: Standard seaworthy wooden pallet

Trade term: FOB ,CNF,CIF

Payment: TT ,LC at sight

 

Advantages

Each front idler is produced using dished out quality steel plates of generous thickness for maximum strength. An abundance of internal reinforcements sage guard shape is against twist from severe usage such as ripping.

 

Maximum strength

The idler assy shaft is machined by the utilization of the most modern technological advances known to the industry. Grinding and finishing methods ensure a mirror like finish and tempering with medium to low frequency heat treating equipment guarantees maximum strength.

 

Cost saving service life

The heavy profiles of idler rims are carefully heat treated in depth for extra service life.

 

Precision care

Each idler assy is precision machined to house special high impact low wear bimetallic bushings.

 

详情图 1 excavator front idler assy

 

Our erthmover front idler group is applicable to below models:

Komatsu

SH55 SH60 SH75 SH80 SH120 SH120A3 SH260 SH265 SH280 SH200 SH220 SH300 SH300-3 SH340 SH350 SH450 SH460

Other brands

IHI30 IS30 IS35 IHI40 IHI50 H30 H45 MM35 MM45 K030 TB150 TB175 SWE50 SWE60 SWE70

We don't list out all items we make. If you need any more items,please feel free to contact with us.

 

Our services

1. Our engineers in this field are more than 20 years. So they can feedback very soon.

2. Sale and service team .You can contact with our team via phone, on line chatting tool and email. Our team will reply to you any time.

3. We have forging and casting. So we can offer customers very competitive prices.

 

Our quality control procedures

1. When raw material come inside our factory,we need to test the material composition first.

2. We need to analyze the composition of the first furnace of the steel liquid every day.

3. After several pcs of parts are heattreated, we need to check the hardness before all to be done to guarantee the hardness.

4. Our inspectors will check the sizes when parts are being machined and parts are being assembled.

 

详情图 2 excavator front idler group

 

FAQ

1. What is the delivery time?

Generally speaking, the delivery time is 20days to 45days.it depend on how many items for a order. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is within 10days.

2. What is MOQ for the order?

Generally speaking, the MOQ is a full container load of 20 feet container. Under this condition, the single cost can be lowered. if customers ask for less full container load. It is also acceptable.

3. What is the percent of your parts for overseas market?

70percent of our parts are for overseas market.

 

 

Hot Tags: pc650-6 excavator idler, China, best, manufacturers, suppliers, factory, Front Idler B50, Front Idler R80 7, Idler For CATERPILLAR E330, Front Idler VIO55 2, Carrier Roller, Front Idler PC60 1

You Might Also Like

(0/10)

clearall