
KX71-3 Excavataor Track Roller
Machine type:crawler tracked excavator
Material:50MN
Guarantee:6months
Product Introduction
KX71-3 excavataor track roller
Production Description
An excavator track roller is one of the essential components of an excavator machine, and it plays a crucial role in helping the machine move and operate effectively. A high-quality excavator track roller must possess several essential conditions to ensure that it works efficiently and effectively.
Structure of KX71-3 excavataor track roller

MODELS AVAILABLE:
K008/K013/K030/K035/K040/K045/KH14/KH025/KH026/KH101/KH36/KH41/KH51/KH61/KH90/KX018/KX024/KX027/KX033/KX045KX057/KX080/KX101/KX121/KX161/KX36/KX41/KX61/KX71/KX91/U15/U17/U20/U25/U30/U45/U50
Sizes of KX71-3 excavataor track roller

Advantages kubota mini excavator spare parts
1.Lubrication oil of our rollers is selected carefully. It can lubricate shaft and bushing well to lower the wearing utmostly. And it can cool the roller perfectly. Those maximize the inner structure life.
2.Collars of rllers are made by ductile iron. It shows exceptional resisitance to shock.

Other more detailed information:
|
Machine weight range |
1.5t to 95.3t |
|
Applicable pitch range |
90 to 317.5 |
|
Material |
ductile iron or alloy steel for track roller collers |
| 45#,50MN or 40MN2 for track roller bodies | |
| 45# or 40Cr for track roller shafts | |
|
Features |
Best selected seal groups,shaft and bushings |
|
Color |
Black,yellow,gray and other color is availabe |
|
Packing |
Standard seaworthy wooden pallets or wooden case |
|
Delivery time |
from 30 days to 45 days |
|
Port of shipment |
Xiamen ,china |
|
guarantee time |
6 months |
|
OEM and ODM |
Acceptable |
|
Payment term |
TT and LC at sight |
Technical requirement
1. Check all parts strictly before assembly and clean them
2. A small amount of oil shall be applied to the mating surface of the shaft sleeve and straight shaft before assembly
3. The floating oil seal ring shall be assembled in pairs, and its sealing surface shall be coated with lubricating oil. The contact surface between O-ring and floating oil seal ring shall not be coated with lubricating grease, and the assembly of floating seal rubber ring shall not be twisted
4. The total assembly force of the floating seal ring shall be 45-50kgf. M, so as to ensure the axial clearance of 0.4-0.9mm after assembly. When turning the wheel body by hand, there is a certain resistance moment, but no jamming
5. After installation, fill in the filtered lubricating oil. The tightening torque of the oil plug is 20 ± 2kgf. M. no leakage is allowed during the inspection
6. The painting color shall comply with jb2299-78

FAQ
1. How To Ensure The Goods Is Available For My Machine?
We have the service information system which can check the machine parts information precisely. If you can't ensure the model or you need customized goods, you can measure the parameter and then we will find that.
2. How Do You Guarantee Your Good's Quality?
First, we have severe quality-control system and ISO certification. Second, we will sign up the parts warranty policy with you. And last, you can visit our factory or ask some quality-test organization to check that.
3. What's Your Advantages Which Is Different From Others?
First, as a manufacture, we can provide goods in mass based on good quality and best price. Second, we can offer goods with small quantity directly even though you are a personal buyer.
Hot Tags: kx71-3 excavataor track roller, China, best, manufacturers, suppliers, factory, Big Excavator Front Idler, Track Link D4D, Sprocket Rim R360, Excavator Sprocket Rim, Tractor Track Roller, Front Idler VIO15
You Might Also Like
Send Inquiry







