Quanzhou Sanqi Engineering Machinery Co.Ltd

enLanguage
Mini Excavator Spare Parts

Mini Excavator Spare Parts

Color:black,yellow,blue,gray
Mini track roller type:inner flange,outter flange
Bushing type:bearig,bimetabl bushing
mounting type:shaft bolt type,collar type

Product Introduction

mini excavator spare parts

Production Description

Track rollers are an essential component of heavy machinery and equipment. They are designed to support the weight of the equipment and ensure smooth movement along the tracks. These rollers come in different sizes and are made of durable materials that can withstand heavy loads and harsh working conditions.

One of the main benefits of track rollers is that they help reduce friction between the tracks and the equipment. This results in lower energy consumption and increased efficiency in the operations of the machinery. Moreover, they also help improve the stability of the equipment and reduce the risk of accidents at the job site.

Another advantage of track rollers is that they are easy to install and maintain. Routine maintenance can help extend the lifespan of the rollers and prevent unnecessary downtime. This can save companies a lot of money in repairs and replacements.

In conclusion, track rollers play a crucial role in the performance and safety of heavy machinery and equipment. They offer numerous benefits such as reduced friction, increased efficiency, improved stability, and reduced maintenance costs. With their many advantages, it's no wonder why they are a widely used component in the construction and mining industries.

 

Sizes mini excavator spare parts

详情图 1 rubber track rollers

 

Other more detailed information of mini excavator spare parts:

Machine weight range

1.5t to 95.3t

Applicable pitch range

90 to 317.5

Material

ductile iron or alloy steel for track roller collers

45#,50MN or 40MN2 for carrier roller assy bodies
45# or 40Cr for carrier rollerassy shafts

Manufacturing method

casing ,forging,heat treatment,lathing,milling,drilling,grinding,oil leakage testing,assembly,painting

Color

Black,yellow,gray and other color is availabe as per customer's requirement

Packing

Standard seaworthy wooden pallets fastened by strong strips

Delivery time

from 20 days to 45 days

Port of shipment

Xiament,Quanzhou

guarantee time

6 months

OEM and ODM

Acceptable

Payment term

TT 30percent as deposit,TT 70 percent balance after receipt the scan copy of bill of lading

LC at sight

 

Technical requirement

1. All parts shall be cleaned before assembly without any sundries;

2. Apply a small amount of clean oil to the grinding surface of the floating seal ring; ensure the axial direction after assembly

The displacement is 0.3-0.6 mm

3. Carry out the pressure test before oil injection, and there is no air leakage under the pressure of 0.5-0.6mpa;

4. After installation, inject clean sae80w-90 gear oil (the oil volume accounts for about the cavity

90% ~ 95% of the volume;

5. Run it in for 3-5 minutes after refueling to make it operate smoothly;

6. After the surface is clean, spray two coats of antirust paint.

 

详情图 2 rubber lower roller

FAQ

 

1. What is MOQ for the order?

Generally speaking, the MOQ is a full container load of 20 feet container. Under this condition, the single cost can be lowered. if customers ask for less full container load. It is also acceptable.

2. Are You A Manufacturer Or A Trader?

We are a manufacturer. We do forging and casting by ourselves. And our factory is located in Quanzhou city, Fujina, China.

3. Could you custom products?

We can manufacture it according to your drawings or samples.

 

 

Hot Tags: mini excavator spare parts, China, best, manufacturers, suppliers, factory, Track Roller SK30, Track Roller PC20 7, Track Roller D50 For Komatsu, Track Roller ITR, Roller Track Digger, Lower Roller Shaft Type For Bulldozer

You Might Also Like

(0/10)

clearall