Quanzhou Sanqi Engineering Machinery Co.Ltd

enLanguage
Track Roller SK60-8

Track Roller SK60-8

Material:50MN
Guarantee:6months
Hardness:Hrc52-Hrc58

Product Introduction

TRACK ROLLER SK80-8

Production introduction 

At present, there are two types of roller structure of crawler construction machinery at home and abroad: straight shaft type and shoulder shaft type. according to
According to the design requirements, simple structure, good technology and few parts shall be selected, but the bearing axial force is slightly poor for excavation
Working condition of excavator type.
The roller is used to support the gravity of the machine. It rolls on the track link or track guide plate.
Therefore, it is used to clamp the track and prevent the track from sliding and derailing laterally. And drive the track on the ground when turning
Slide up side. The roller sometimes works in mud and water, and bears a large impact load. Therefore,
Reliable sealing, low wheel rim wear resistance and rolling resistance.

Main structure            

Roller body, supporting axle, shaft sleeve, sealing ring, Collar and other relevant components. The roller can be divided into unilateral roller and bilateral roller; the rollers for excavator are generally painted in black, and the rollers for bulldozer are generally painted in yellow

LOWER ROLLER STRUCTURE

lower roller SK60-8


TRACK ROLLER PAINTING


Bottom rollers for kobelco excavators:


SK024SK030SRSK30SK03N2SK042SK045SK045SR
SK50SK60-3SK60-5SK60-8SK100-3SK120-3SK120-8
SK140-8SK100-4SK200-3SK200-5SK200-6SK200-8SK220
SK300SK300-3SK300-6SK310SK320SK330-8SK350-8
SK400SK07-1SK09N2SK04-1SK35SK55SK75
SK210SK230SK320-6




BOTTOM ROLLER SK60-8

FAQ

1. Are You A Manufacturer Or A Trader?

We are a manufacturer. We do forging and casting by ourselves. And our factory is located in Quanzhou city, Fujina, China.

2. How Could You Know If Our Parts Are Fitted To Machines?

Please offer us the detailed machine models or mounting sizes.

3. How About The Payment Terms?

TT 30 percent deposit,and TT 70percent balance after seeing the scan copy of bill of lading or LC at sight.

4. What Is The Delivery Time?
20-45 days after receiving the down.

5. Packaging
Packed on fumigating pallet with steel strip.

6. Delivery Port
Main port: Dalian, xiamen, ningbo, China

7. What About The Warranty Time?
Excavator: 6months or 2000 working hours

8. Are You A Factory Or A Trade?
We are a factory with casting and forging

9. Where Is Your Factory?
The factory is mainly distributed in fujian province, China


Hot Tags: track roller sk60-8, China, best, manufacturers, suppliers, factory, Track Roller PC20 7, Track Carrier Roller, Track Roller PC300 5 PC300 6 PC300 7 PC300 8, Bottom Roller R210 7 For HYUNDAI, Kubota Excavator Track Rollers, Bulldozer Bottom Roller D5B

You Might Also Like

(0/10)

clearall