
Vio30 Excavator Track Roller
It is composition of two pieces of forged semi-roller and the roller body is welded by CO2 automatic welding.
Product Introduction
vio30 excavator track roller
Production description
Excavator track rollers are an essential component of an excavator's undercarriage system. The undercarriage system supports the weight of the excavator, enables it to move smoothly and efficiently, and ensures that it maintains traction on even the roughest surfaces.
Structure of vio30 excavator track roller

Sizes of vio30 excavator track roller

Technical requirements:
1. Before installation, remove the slag on the surface of each part and clean it
2. Install the floating oil seal ring correctly. The surface is coated with pure oil film, and the O-ring shall not be twisted or skewed
3. The assembly must pass the sealing test without air leakage under the pressure of 0.6MPa
4. Each filling hole must be filled with diesel engine oil ecc40
5. After 6 minutes running in test, the manually rotating wheel body shall be light without jamming
6. Degrease the outer surface and spray two coats of antirust paint
Other more detailed information of excavator track roller are as below excel file:
|
MODLE |
vio30 excavator track roller |
|
Machine weight range |
1.5t to 95.3t |
|
Applicable pitch range |
90 to 317.5 |
|
features |
Self-lubricated and maintainace free |
|
Manufacturing method |
casing ,forging,heat treatment,lathing,milling,drilling,grinding,oil leakage testing,assembly,painting |
|
Color |
Black,yellow,gray |
|
Packing |
Polywood pallets |
|
Delivery time |
from 30 days to 45 days |
|
Port of shipment |
Xiamen,china |
|
guarantee time |
6 months |
|
Payment term |
TT 30percent after contract,TT 70percent before shipment |
Models Available For Yanmar Excavators:
VIO15,VIO17,VIO18,VIO20,VIO30-1,VIO30-2,VIO35,VIO40-1,VIO40-2,VIO50-2,VIO50-6,VIO70,VIO75,VIO55-2,VIO55-6,B17,B27,B37,B50 ETC..
We do forging by ourselves, it makes us design the rollers more reasonalbly and fast delivery.

FAQ
1. How About The Payment Terms?
TT 30 percent deposit,and TT 70percent balance after seeing the scan copy of bill of lading or LC at sight.
2. What Is The Delivery Time?
Generally speaking, the delivery time is 30 days. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is from 10-15 days.
3. What Is MOQ For The Order?
FCL and LCL are both acceptable.
4. How Can You Control Your Quality?
When material come inside our factory, we need to analyze the material cost. And our inspectors will check the sizes at random when parts are being machined or assembled. All of these can guarantee the parts with correct sizes and good quality.
Hot Tags: vio30 excavator track roller, China, best, manufacturers, suppliers, factory, Carrier Roller E325 E330, Mini Digger Track Rollers, Track Roller Zaxis, Hitachi Excavator Track Roller, Bulldozer Track Shoe Group, Mini Track Roller
You Might Also Like
Send Inquiry







