
Crawler Crane Track Shoe
Crawler Crane Track Shoe Production introduction: In normal operation, the track pin slowly rotates backward in the pin hole, and the two wear evenly, the pin hole gradually becomes larger, and the pin gradually becomes thinner. If the operation is improper, such as turning at high speed,...
Product Introduction
Crawler Crane Track Shoe
Production introduction:
In normal operation, the track pin slowly rotates backward in the pin hole, and the two wear evenly, the pin hole gradually becomes larger, and the pin gradually becomes thinner. If the operation is improper, such as turning at high speed, starting abruptly, or entering mud, weeds and so on to block the pin, the pressure on the left and right sides of the track shoe will be too heavy to bend down, the pin will be deformed and bent, and cannot rotate in the pin hole, the pin and the pin hole will become sliding friction, and the friction part is limited to a small part of the contact surface, the pin will gradually grind into a crank shape, and the pin hole will also become an ellipse. The increase of pin hole also causes the lengthening of track pitch (pitch is the center distance of holes at both ends of track shoe), so the track shoe and driving wheel grind each other, the track shoe is worn through, and the teeth of driving wheel are in the shape of blade. According to the measurement, when the pitch changes from 174 mm to 184 mm, the opening width of the driving wheel teeth changes from 87 mm to 97 mm, then the normal rolling engagement is completely destroyed.
Because of the lengthening of the track shoe pitch, it also causes the roller to jump when walking, which accelerates the wear of the track part of the track shoe. When the runway part is sunk more than 4mm, it should be repaired. The wear of the guide part of the track shoe is mainly caused by the track deviation, the serious deformation of the track shoe, and the axial shaking of the roller and the guide wheel. The common scrapped track shoes are severely worn or worn through at the meshing part with the driving wheel
Finally, check whether the two ends of the chain drive shaft are synchronous and whether the tooth end is excessively worn.

Crawler track shoe,Crawler track shoe plate,Crawler track pad
| Hitachi | KH100/30T,KH100-2/3KH125/35T,KH150/40T,KH180/50T,KH300/80T,KH500/100T, |
| KH700/150T,KH850/150T,KH1000/200T | |
| Kobelco | P&H60P,P&H70P,P&H75P,P&H100P,P&H315,P&H320,P&H325,P&H330,P&H335, |
| P&H335AS,P&H345,P&H440,P&H550A,P&H550-1,P&H550-2,P&H5035,P&H5045, | |
| P&H5055,P&H5100,P&H7035,P&H7045,P&H7050,P&H7055, | |
| P&H7065,P&H7070,P&H7080,P&H7090,P&H7100,P&H7120,P&H7150,P&H7200, | |
| P&H7250,P&H7250-2,FS80,FS90,BM500,BM600,BM650,BM700,BM700HD,BM750,BM800, | |
| BM800HD,BM900, | |
| BM900HD,BM1200,CKS600,CKE600,CKE700,CKE800,CKE850,CKE900,CKE1000,CKE1100, | |
| CKE1350,CKE1800,CKE2500,CKE2500-2,CKE850,CK1000,CK1000G,CK1600,CK2000-2, | |
| CK2500,SL6000 ETC.. | |
| Sumitomo | SC500-2/50T,SC700/70T,SC2500/250T,LS78R,LS108/40T,LS118-5/50T,LS120,LS218/80T,LS238/100T,LS248/150T,LS368,LS468,SA1700 |
| IHI | CCH250W,CCH280W,CCH500/50T,DCH700/70T,DCH800/80T,CCH800,CCH1500E, |
| CCH2500/250T | |
| Minitowoc | 4100WS1/180-272T,4100S,4600S4/317.5,M250/250T,M2250/272T,M999/250T,M4600/317.5T,M18000/600T,M21000/1000T |
| Demag | CC1400/250T,CC1800/300T,CC2000/300T,CC2200/350T,CC2400/400T,CC2500/450T, |
| CC2800/600T,CC5800/1000T | |
| Sany | SCC500,SCC600,SCC750,SCC800,SCC1000,SCC1250,SCC1500,SCC1800,SCC2600,SCC4000,SCC6500,SCC7500,SCC10000,SCC16000 |
| Zoomlion | QUY50,QUY70,QUY80,QUY100,QUY130,QUY180,QUY200,QUY260,QUY350,QUY400,QUY450,QUY500,QUY550,QUY600,QUY650,QUY800,QUY1000,ZTM300,ZTM500,ZTM750,ZTM800,ZTM550,ZTM3200 |
FAQ
1. Are you a manufacturer or a trader?
We are a manufacturer. We do forging and casting by ourselves. And our factory is located in Quanzhou city, Fujina, China.
2. How could you know if our parts are fitted to machines?
Please offer us the detailed machine models or mounting sizes.
3. How about the payment terms?
TT 30 percent deposit,and TT 70percent balance after seeing the scan copy of bill of lading or LC at sight.
4. What is the delivery time?
Generally speaking, the delivery time is 20days to 45days.it depend on how many items for a order. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is within 10days.
Hot Tags: crawler crane track shoe, China, best, manufacturers, suppliers, factory, Swamp Track Shoe, Rubber Track Shoe Plate, Bulldozer Track Shoe Plate, Excavator Track Shoe, Excavator Track Shoe Plate, Bulldozer Track Shoe
You Might Also Like
Send Inquiry







