Quanzhou Sanqi Engineering Machinery Co.Ltd

enLanguage
Carrier Roller D31-17

Carrier Roller D31-17

The carrier roller group is used to hold the track upward so that the track has a certain degree of tension.

Product Introduction

Production description

The carrier roller group is used to hold the track upward so that the track has a certain degree of tension.

And we offer a wide range of excavator top roller group for the most popular models.our rollers are engineered with forged alloy steel which is through a proper heat treatment allowing durability and impact. Our rolles are highly praised in the market as a product with impact resistance and a long life


Quick detail:

Origin:

Fujian,China

Brand

SQ, GTR

Model:

D31-17

Hardness of trail surface

HRC52-58

Color

Yellow, black, gray

Roller body material

50MN

Delivery time

20-45days

Warranty time

6 months

Name

upper roller group

Machine type

Crawler tracked excavator


Attentions while assembling the excavator top roller group

1. Before assembling rollers,smooth the sharp part of sapre parts and do the deburring,clean the inner holes of the roller body and oil seal etc..

2. Do not break and scratch any part of the sealing parts.

3. Do not oil and distort the rubber floating seal ring during assembling the rollers.

4. A small amount of oil should be covered on the contacting surface while fitting the floating seal group.

5. After finishing the assembling process,fill clean extreme-pressure vehicle gear oil to take 80 percent of the inner cavity of roller body and do the running test then confirm no leakage after 4 hours.


Sizes


详情图 2 carrier roller group


Structure


详情图 3 upper roller group


Replacement parts of carrier roller for   Caterpillar,Komatsu,Hitachi,Kobelco,
Mitsubishi,Sumitomo,Daewoo,Hyundai,Samsung and   etc.
No.Part   No.Model
190306-04080FURUKAWA   PCR200
281467489TAMROCK   660
33T4352D3B,D3C
43T4353D3B,D3C
56T9887,9P4218D4C,D4D
66T9883,9P4213D4C,D4D
79T9879,9S9539D5,D6B,955
89T9875,9S9538D5,D6B,955
99G8029,7G0421D6C,D6D
109G8034,7G0423D6C,D6D
117T4102D6H
127T4107D6H
136T9871,9S0316D7F,D7G,977
146T9867,9S0317D7F,D7G,977
159W5586D7H
169W5585D7H
176P4897D8H,D8K
186P4898D8H,D8K
19111-30-00274D30,D31
20111-30-00281D30,D31
21131-30-00322D50,D60-3
22131-30-00332D50,D60-3
23141-30-00575D60-6,D65,D70
24141-30-00585D60-6,D65,D70
25155-30-00124D80,D85
26155-30-00114D80,D85
27175-30-00486D155
28175-30-00496D155
294I7346,861934311,312,E110B,E120B
30E84310103E200B
31854973E300B
328E5032320
336Y1057,1175046325
346Y2795,1175047330
35201-30-00060PC60-5
36201-30-00062pc60-6
37203-30-00140PC100-2,PC100-3,PC100-5
38205-30-00172PC200-3
3920Y-30-00012PC200-5,PC200-6
40207-30-00024PC300-3
41207-30-00150PC300-5,PC300-6
42208-30-00210PC400-3,PC400-5,PC400-6
439066207EX60
4490,437,339,019,471UH04-5,UH045-5,UH052
4590,490,949,018,669UH04M,UH052M
469066508UH053,UH063EX100,EX120
479066691UH053M,UH073,EX100M
489066510UH07,UH081,UH083,EX200
499066509UH103,EX220
509114681EX200-2,EX220-2
5190,666,909,114,682EX300,EX300-2,EX300-3
529072631EX400
53B90N-0061F5SK04,K904
54B90N-0059F6SK07,K907
5524100N6400F2SK07-N2,K907-
5624100N4042F2SK100,SK120
5724100N5947F3SK200,SK200-3
5824100J11696F2SK220
5924100N3856F1SK300
60C24302401MS110-5,MS110-8
61957138,E34301300MS180-8,E180,E240
62KMA0357S260LL,LS2600BJ,LS2600BLJ
63KNA0533S40,LS2500,SH100
64KRA1189SH200
65KSA0671SH300
66KSA0672SH300
672270-1098DH220-2,S220-3,S220LC-3
682270-9401DH280-2,S280-3,S280LC-3
692270-9404SH450-2,S450-3,S450LC-3
70ER200-2,R210-2,R210LC-2
7181E5-2002R320-2,R320-3,R320LC-3
7281E7-0015R360-2,R360-3,R360LC-3
731081-03680SE210-2,SE210-3,EC210-3
741081-03871SE280-2,SE280LC-2,EC280-3
751081-01800SE350-2,SE350LC-2,EC360-3
Note:the above part numbers shown are for   referrence purpose only.we do not 
imply that these items are products of the OEM


Our factory in Quanzhou city, Fujian, China

Our factory is located in Quanzhou city which is the cultural capital of east asia, the starting point of the silk road at sea.

Our many products are undercarriage parts(track roller,excavator top roller group,sprocket rim,front idler,track link) for crawler-tracked machiner like bulldozers, excavators,cranes,drillers etc.

After many years at this field, we developed many of parts of most of popular brands abroad and domestic.So we can meet the requirements of most customers abroad and domestic too.what is more, we can develop parts as per customers’ drawings or samples. We are looking forward to cooperation with you at win win relationship very soon!


详情图 4 top roller group


FAQ

1. How about the payment terms?

TT 30 percent deposit,and TT 70percent balance after seeing the scan copy of bill of lading or LC at sight.

2. What is the delivery time?

Generally speaking, the delivery time is 30 days. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is from 10-15 days.

3. What is MOQ for the order?

FCL and LCL are both acceptable.

4. How can you control your quality?

When material come inside our factory, we need to analyze the material cost. And our inspectors will check the sizes at random when parts are being machined or assembled. All of these can guarantee the parts with correct sizes and good quality.



Hot Tags: carrier roller d31-17, China, best, manufacturers, suppliers, factory, Carrier Roller D31 17, Excavator Carrier Roller, Carrier Roller PC400 7, Top Roller For Cranes, Carrier Roller PC200 8, Crane Carrier Roller

You Might Also Like

(0/10)

clearall