
Product Introduction
Carrier Roller D7G
Production Introduction:
The carrier roller is to hold the track upward, so that the track has a certain degree of tension.
Technical Requirements Of Top Roller D7G
1. Assemble front wheel inner hole, bearing, oil seal and other parts, and clean them
2. Grease shall be applied to the three rubber rings before assembly, but the contact surface of O-type floating seal rubber ring and floating seal ring shall not be oiled, and the rubber ring shall not be twisted after assembly
3. The oil seal ring shall be thoroughly cleaned. During assembly, the working surface of the oil seal ring shall be strictly kept clean and divided by the clean oil
4. After assembly, the displacement of supporting axle is 0.1-0.2mm, and it can rotate flexibly by hand
5. After assembly, inject vehicle oil (summer 15, winter 10) for four hours without leakage
6. The painting color of the assembly shall be in accordance with jb2299-78 painting color and safety sign of mining, engineering, hoisting and transportation machinery products

Models of carrier roller assy of caterpillar bulldozers:
| 517 | 527 | 561B | 561C | 561D | 561H |
| 571A | 571F | 571G | 572D | 572E | 572F |
| 572G | 578 | 583H | 583K | 589 | 594 |
| D10N | D10R | D10T | D11N | D11R | D2 |
| D3 | D3 LGP | D3B | D3B LGP | D3C | D3C LGP |
| D3C SA | D3G LGP | D3G XL | D4 | D4B | D4B LGP |
| D4C | D4C LGP | D4C XL | D4D | D4D LGP | D4D SA |
| D4E | D4E LGP | D4D SA | D4E | D4E LGP | D4E SA |
| D4G XL | D4H | D4H LGP | D4H TSK | D4H XL | D4K XL |
| D5 | D5 LGP | D5 SA | D5B | D5B LGP | D5B SA |
| D5C | D5C LGP | D5E | D5G LGP | D5G XL | D5H |
| D5H LGP | D5H TSK | D5H XL | D5K LGP | D5K XL | D5M LGP |
| D5M XL | D5N LGP | D5N XL | D6 | D6B | D6C |
| D6C | D6C DD | D6C LGP | D6C SA | D6D | D6D DD |
| D6D LGP | D6D PS | D6E | D6F | D6G | D6H |
| D6H LGP | D6H XL | D6H XR | D6M LGP | D6M XL | D6N LGP |
| D6N XL | D6R | D6R LGP | D6R XL | D6R XR | D7 |
| D7C | D7D | D7E | D7E PS | D7F | D7F PS |
| D7G | D7G LGP | D7G PS | D7G SA | D7H | D7H LGP |
| D7H XR | D7R | D7R LGP | D7R STD | D7R XR | D8 |
| D8D | D8G | D8H | D8K | D8L | D8N |
| D8R | D8T | D9D | D9E | D9G | D9G DUALF |
| D9G SXSL | D9G SXSR | D9H | D9L | D9N | D9R |
| D9T |
FAQ
1. What Is The Percent Of Your Parts For Overseas Market?
70percent of our parts are for overseas market.
2. Is There Any Guarantee Of Your Parts?
There are 6 months guarantee time for excacavar parts under normal working conditions and 3months guaranteet tiem for bulldozer parts under normal working conditions.
3. How Do You Offer Guarantee?
If parts are broken due to manufacturing problem, we will deduct the value for next order amount or offer you brand new one to replce.
4. Could You Make Customer Logo?
Yes,we can make customer logos if it reach the moq for customer logo order.
5. If We Don’t Have Drawings, Could We Develop A New Item?
Yes, you can offer us the main dimension. Then we can compare with our ready products and make a drawing for your checking.
UPPER ROLLER D7G
Hot Tags: carrier roller d7g, China, best, manufacturers, suppliers, factory, Carrier Roller SH60, Big Excavator Carrier Roller, Carrier Roller EC210B EC240, Crawler Tracked Crane Top Roller, Carrier Roller PC300 5 PC300 6, Carrier Roller Group
You Might Also Like
Send Inquiry







