
VIO75 Excavator Top Roller
The carrier roller group is used to hold the track upward so that the track has a certain degree of tension.
Product Introduction
VIO75 excavator top roller
Production description
An excavator top roller is an essential component of the excavator machinery. It is mainly used to support and guide the excavator tracks as they move along the undercarriage. This roller is made of highly durable materials that can withstand the heavy weight of the tracks and the pressure exerted on them during operation.
The top roller is an essential part of the excavator system that helps in the smooth operation of the machine. It helps to reduce the wear and tear of the tracks by guiding them along the undercarriage, providing better stability and traction. It also helps to distribute the weight of the machine evenly, reducing the overall impact on the tracks and increasing their lifespan.
The top roller is an important component of the excavator that requires regular maintenance and replacement when necessary. Taking care of this part of the machine will ensure optimal performance, extended lifespan, and overall efficiency. It is important to choose high-quality top rollers and ensure that they are installed correctly to guarantee their longevity and effectiveness.
In summary, an excavator top roller is a crucial part of the excavator machinery that plays a pivotal role in the operation of the machine. Taking care of this component will help in the smooth running of the machine and ensure that it lasts for a long time.
Quick detail:
|
Origin: |
Fujian,China |
Brand |
SQ, GTR |
|
Model: |
VIO75 excavator top roller |
Hardness of trail surface |
HRC52-58 |
|
Color |
Yellow, black, gray |
Roller body material |
50MN |
|
Delivery time |
20-45days |
Warranty time |
6 months |
|
Name |
upper roller group |
Machine type |
Crawler tracked excavator |
Attentions while assembling the VIO75 excavator top roller
1. Before assembling rollers,smooth the sharp part of sapre parts and do the deburring,clean the inner holes of the roller body and oil seal etc..
2. Do not break and scratch any part of the sealing parts.
3. Do not oil and distort the rubber floating seal ring during assembling the rollers.
4. A small amount of oil should be covered on the contacting surface while fitting the floating seal group.
5. After finishing the assembling process,fill clean extreme-pressure vehicle gear oil to take 80 percent of the inner cavity of roller body and do the running test then confirm no leakage after 4 hours.
Sizes of VIO75 excavator top roller

Structure of VIO75 excavator top roller

| Replacement parts of carrier roller for Caterpillar,Komatsu,Hitachi,Kobelco, | ||
| Mitsubishi,Sumitomo,Daewoo,Hyundai,Samsung and etc. | ||
| No. | Part No. | Model |
| 1 | 90306-04080 | FURUKAWA PCR200 |
| 2 | 81467489 | TAMROCK 660 |
| 3 | 3T4352 | D3B,D3C |
| 4 | 3T4353 | D3B,D3C |
| 5 | 6T9887,9P4218 | D4C,D4D |
| 6 | 6T9883,9P4213 | D4C,D4D |
| 7 | 9T9879,9S9539 | D5,D6B,955 |
| 8 | 9T9875,9S9538 | D5,D6B,955 |
| 9 | 9G8029,7G0421 | D6C,D6D |
| 10 | 9G8034,7G0423 | D6C,D6D |
| 11 | 7T4102 | D6H |
| 12 | 7T4107 | D6H |
| 13 | 6T9871,9S0316 | D7F,D7G,977 |
| 14 | 6T9867,9S0317 | D7F,D7G,977 |
| 15 | 9W5586 | D7H |
| 16 | 9W5585 | D7H |
| 17 | 6P4897 | D8H,D8K |
| 18 | 6P4898 | D8H,D8K |
| 19 | 111-30-00274 | D30,D31 |
| 20 | 111-30-00281 | D30,D31 |
| 21 | 131-30-00322 | D50,D60-3 |
| 22 | 131-30-00332 | D50,D60-3 |
| 23 | 141-30-00575 | D60-6,D65,D70 |
| 24 | 141-30-00585 | D60-6,D65,D70 |
| 25 | 155-30-00124 | D80,D85 |
| 26 | 155-30-00114 | D80,D85 |
| 27 | 175-30-00486 | D155 |
| 28 | 175-30-00496 | D155 |
| 29 | 4I7346,861934 | 311,312,E110B,E120B |
| 30 | E84310103 | E200B |
| 31 | 854973 | E300B |
| 32 | 8E5032 | 320 |
| 33 | 6Y1057,1175046 | 325 |
| 34 | 6Y2795,1175047 | 330 |
| 35 | 201-30-00060 | PC60-5 |
| 36 | 201-30-00062 | pc60-6 |
| 37 | 203-30-00140 | PC100-2,PC100-3,PC100-5 |
| 38 | 205-30-00172 | PC200-3 |
| 39 | 20Y-30-00012 | PC200-5,PC200-6 |
| 40 | 207-30-00024 | PC300-3 |
| 41 | 207-30-00150 | PC300-5,PC300-6 |
| 42 | 208-30-00210 | PC400-3,PC400-5,PC400-6 |
| 43 | 9066207 | EX60 |
| 44 | 90,437,339,019,471 | UH04-5,UH045-5,UH052 |
| 45 | 90,490,949,018,669 | UH04M,UH052M |
| 46 | 9066508 | UH053,UH063EX100,EX120 |
| 47 | 9066691 | UH053M,UH073,EX100M |
| 48 | 9066510 | UH07,UH081,UH083,EX200 |
| 49 | 9066509 | UH103,EX220 |
| 50 | 9114681 | EX200-2,EX220-2 |
| 51 | 90,666,909,114,682 | EX300,EX300-2,EX300-3 |
| 52 | 9072631 | EX400 |
| 53 | B90N-0061F5 | SK04,K904 |
| 54 | B90N-0059F6 | SK07,K907 |
| 55 | 24100N6400F2 | SK07-N2,K907- |
| 56 | 24100N4042F2 | SK100,SK120 |
| 57 | 24100N5947F3 | SK200,SK200-3 |
| 58 | 24100J11696F2 | SK220 |
| 59 | 24100N3856F1 | SK300 |
| 60 | C24302401 | MS110-5,MS110-8 |
| 61 | 957138,E34301300 | MS180-8,E180,E240 |
| 62 | KMA0357 | S260LL,LS2600BJ,LS2600BLJ |
| 63 | KNA0533 | S40,LS2500,SH100 |
| 64 | KRA1189 | SH200 |
| 65 | KSA0671 | SH300 |
| 66 | KSA0672 | SH300 |
| 67 | 2270-1098 | DH220-2,S220-3,S220LC-3 |
| 68 | 2270-9401 | DH280-2,S280-3,S280LC-3 |
| 69 | 2270-9404 | SH450-2,S450-3,S450LC-3 |
| 70 | E | R200-2,R210-2,R210LC-2 |
| 71 | 81E5-2002 | R320-2,R320-3,R320LC-3 |
| 72 | 81E7-0015 | R360-2,R360-3,R360LC-3 |
| 73 | 1081-03680 | SE210-2,SE210-3,EC210-3 |
| 74 | 1081-03871 | SE280-2,SE280LC-2,EC280-3 |
| 75 | 1081-01800 | SE350-2,SE350LC-2,EC360-3 |
| Note:the above part numbers shown are for referrence purpose only.we do not | ||
| imply that these items are products of the OEM | ||
Our factory in Quanzhou city, Fujian, China
Our factory is located in Quanzhou city which is the cultural capital of east asia, the starting point of the silk road at sea.
Our many products are undercarriage parts(track roller,excavator top roller group,sprocket rim,front idler,track link) for crawler-tracked machiner like bulldozers, excavators,cranes,drillers etc.
After many years at this field, we developed many of parts of most of popular brands abroad and domestic.So we can meet the requirements of most customers abroad and domestic too.what is more, we can develop parts as per customers' drawings or samples. We are looking forward to cooperation with you at win win relationship very soon!

FAQ
1. How about the payment terms?
TT 30 percent deposit,and TT 70percent balance after seeing the scan copy of bill of lading or LC at sight.
2. What is the delivery time?
Generally speaking, the delivery time is 30 days. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is from 10-15 days.
3. What is MOQ for the order?
FCL and LCL are both acceptable.
4. How can you control your quality?
When material come inside our factory, we need to analyze the material cost. And our inspectors will check the sizes at random when parts are being machined or assembled. All of these can guarantee the parts with correct sizes and good quality.
Hot Tags: vio75 excavator top roller, China, best, manufacturers, suppliers, factory, Bulldozer Cutting Edge, Bulldozer Track Assy, Carrier Roller R200, Bulldozer Track Link Assembly, Front Idler JS140, Track Roller B12
You Might Also Like
Send Inquiry







