Quanzhou Sanqi Engineering Machinery Co.Ltd

enLanguage
E308 EXCAVATOR IDLER

E308 EXCAVATOR IDLER

Material:ZG50MN
Color:Black or customerized
Hardness:HRC48-HRC56

Product Introduction

E308 EXCAVATOR IDLER

Product introduction

The working principle of the guide wheel assembly is as follows: the oil is injected into the cylinder through the oil nozzle with a grease gun, so that the piston extends outward to push the tension spring, so that the guide wheel moves left to tighten the track, and the tightening spring has a proper stroke, when the tension force is too large, the spring is compressed to cushion; when the excessive tension force disappears, it is compressed. The spring pushes the guide wheel in situ, which ensures sliding along the crawler rack to change the wheelbase, ensures the disassembly and assembly of the crawler, reduces the impact of the walking process, and avoids derailment of the track chain.

 

Structure of E308 EXCAVATOR IDLER

FRONT IDLER

Heattreatmetn of E308 EXCAVATOR IDLER

front idler casting

Painting of E308 EXCAVATOR IDLER

idler painting

Advantages of E308 EXCAVATOR IDLER

 

Cost saving service life

The heavy profiles of idler rims are carefully heat treated in depth for extra service life.

Precision care

Each idler assy is precision machined to house special high impact low wear bimetallic bushings.

 

Model of idler assy:

Models Of Idler Assy:

CAT301.5,CAT303CCR,CAT304,CAT305.5,CAT307,CAT307,CAT110B,CAT120B,CAT312,CAT320,CAT322,CAT324,CAT325,CAT330,CAT345 ETC..


FAQ

1. How About The Payment Terms?

TT 30 percent deposit,and TT 70percent balance after seeing the scan copy of bill of lading or LC at sight.

2. What Is The Delivery Time?

Generally speaking, the delivery time is 20days to 45days.it depend on how many items for a order. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is within 10days.

. What Is MOQ For The Order?

Generally speaking, the MOQ is a full container load of 20 feet container. Under this condition, the single cost can be lowered. if customers ask for less full container load. It is also acceptable.

 

Hot Tags: e308 excavator idler, China, best, manufacturers, suppliers, factory, Front Idler EX100 2 EX100 3 EX100 5, Front Idler MS070, Front Idler EX30, Front Idler BD2G, Front Idler DX480, Front Idler ZAX870

You Might Also Like

(0/10)

clearall