
Dozer Undercarriage Parts Near Me
We supply undercarriage parts for bulldozer,excavator and other crawler-tracked machines.
Our parts include track roller,carrier roller,idler,sprocket,track etc.
Our main market is overseas market.
Product Introduction
Products Description
dozer undercarriage parts near me
As the core component of the bulldozer chassis, the performance of the support wheel directly affects the reliability and work efficiency of the entire machine.
At present, in related technologies, the supporting wheel includes the wheel body, wheel axle, bearing, end cover, floating oil seal, rubber ring, and pin. The bearing is pressed into the wheel body, the wheel axle is penetrated into the bearing, the floating oil seal and rubber ring are respectively installed into the wheel body, and the two end covers are fixed with the wheel axle through pins. The assembly process of this structure is complex and costly, making it suitable for heavy-duty excavators with medium to large tonnage.

The design of double-cone sealing and lubrication for life makes the top roller have long life time and perfect performance under any working condition.

Differential type of quenching or through type of quenching heattreatment can ensure certain heat treatment hardness depth and so give good anti-cracking effects.
technical requirement
1. Before assembly, the sharp angle and burr of the parts shall be removed, and the bore, bearing, oil seal and other parts in the wheel body shall be cleaned.
2. Floating oil seal and other parts shall not be scratched or bruised.
3. The floating seal rubber ring shall not be stained with oil or twisted during assembly.
4. A small amount of oil shall be applied to the pressure fitting surface and floating oil seal fitting surface during assembly.
5. After assembly, inject 700ml of vehicle gear EP oil with clean capacity, and check after 4 hours to ensure there is no leakage.
6. The painting color of the assembly shall be in accordance with the customer's requirements.
FAQ
1. How About The Payment Terms?
TT 30 percent deposit,and TT 70percent balance after seeing the scan copy of bill of lading or LC at sight.
2. do your rollers have rock bushs?
we have too kinds of dozer track roller.one is with rock bush and the other is without rock bush.
3.How much is your lead time?
If there is no stock,it is 30-40days after we get deposit of the order.
Product Picture


Our factory

Heattreatment

Welding

Assembly

Warehouse
Hot Tags: dozer undercarriage parts near me, China, best, manufacturers, suppliers, factory, Kubota Kx161 3 Track Roller, Track Roller SH300 For SUMITOMO, Track Roller SK200 8, Track Roller Assy, Track Roller HD720 For Kato, Crane Bottom Roller
You Might Also Like
Send Inquiry







