
Excavator Replacement Parts
Color:black,yellow,blue,gray
Mini track roller type:inner flange,outter flange
Bushing type:bearig,bimetabl bushing
mounting type:shaft bolt type,collar type
Product Introduction
Products Description
excavator replacement parts
Production Description
An excavator track roller is one of the essential components of an excavator machine, and it plays a crucial role in helping the machine move and operate effectively. A high-quality excavator track roller must possess several essential conditions to ensure that it works efficiently and effectively.


Excavator track rollers are a core part of an excavator's undercarriage system. The successful design of this component is crucial for the efficient and reliable operation of the entire machine. The rollers are responsible for providing support to the excavator's weight as well as allowing for the smooth advancement of the machine.
The structure of an excavator track roller consists of several important parts. These include the outer ring, inner ring, shaft, and seals. The outer ring is usually made of forged or cast steel, which provides maximum strength and durability. The inner ring is designed to hold the shaft in place and is typically made of high-tensile steel.
The shaft is an essential component of the roller as it guarantees stability and rotation. It is made of high-quality steel and is precisely engineered to fit the inner and outer rings perfectly. The seals, on the other hand, are responsible for retaining the lubricant within the roller and preventing contamination from coming in. This ensures a longer service life for the rollers.
The design of the excavator track rollers has undergone significant advancements over the years. Nowadays, many manufacturers are using computer-aided design (CAD) and finite element analysis (FEA) to optimize their design process. As a result, the rollers are not only more robust and durable, but they are also lighter and more efficient.
In conclusion, the successful design of the excavator track roller is critical for the performance of the entire excavator. The use of high-quality materials and advanced design techniques plays a key role in ensuring that these rollers offer maximum strength, durability, and performance throughout their service life.
Technical requirement
1. All parts shall be cleaned before assembly without any sundries;
2. Apply a small amount of clean engine oil to the grinding surface of the floating seal ring;
3. Idle for more than 10 times after assembly;
4. Carry out the pressure test before oil injection, and there is no air leakage under the pressure of 0.5-0.6mpa;
5. After installation, inject clean sae80w-90 gear oil (the oil volume accounts for about the cavity
90% ~ 95% of the volume;
6. After the surface is clean, spray two coats of dark blue antirust paint.
FAQ
1. Are You A Manufacturer Or A Trader?
We are a manufacturer. We do forging and casting by ourselves. And our factory is located in Quanzhou city, Fujina, China.
2. How Could You Know If Our Parts Are Fitted To Machines?
Please offer us the detailed machine models or mounting sizes.
3. How About The Payment Terms?
TT 30 percent deposit,and TT 70percent balance after seeing the scan copy of bill of lading or LC at sight.
4. What Is The Delivery Time?
Generally speaking, the delivery time is 20days to 45days.it depend on how many items for a order. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is within 10days.
5. What Is MOQ For The Order?
Generally speaking, the MOQ is a full container load of 20 feet container. Under this condition, the single cost can be lowered. if customers ask for less full container load. It is also acceptable.
6. How Can You Control Your Quality?
When material come inside our factory, we need to analyze the material cost. And when front idlers and sprocket rims material are casted. We need to analyze the composition to see if the material is qualified or not. When track rollers, carrier rollers and front idlers are being assembled, we need to oil leakage testing. After several parts are heat treated, we need to check the hardness before all are done.And our inspectors will check the sizes at ramdom when parts are being machined or assembled. All of these can guarantee the parts with correct sizes and good quality.
7. What Is The Percent Of Your Parts For Overseas Market?
70percent of our parts are for overseas market.
excavator replacement parts Models Available
| CATERPILLAR | ||||
| CAT 301.5C | CAT 305.5 | CAT 120B | CAT 322 | D3C |
| CAT 302.5C | CAT 305C | CAT 311 | CAT 324 | D3C |
| CAT 303CR | CAT 306 | CAT 312 | CAT 325 | D4H,D4D,D5M |
| CAT 304CCR | CAT 307 | CAT 320 | CAT 330 | D5B,D5H |
| CAT 303.5 | CAT308 | CAT 320D | CAT 345 | D6C,D6D,D6R,D7F,D7G |
Workshop


Our factory

Painting

Cleaning

Assembly

Stock
Hot Tags: excavator replacement parts, China, best, manufacturers, suppliers, factory, Track Roller PC75UU, Kubota Track Roller, bottom roller D7G for bulldozer, Track Roller IHI40, Track Roller For HITACHI EX60 2, Mini Track Roller PC50UU
You Might Also Like
Send Inquiry







