Quanzhou Sanqi Engineering Machinery Co.Ltd

enLanguage
Track Shoe PC200-2 PC200-5 PC200-7 PC200-8

Track Shoe PC200-2 PC200-5 PC200-7 PC200-8

Hardness HCR38-42
Length:Standard or customerized
machine type:crawler tracked

Product Introduction

Track Shoe PC200-2 PC200-5 PC200-7 PC200-8

Production Introduction:

Crawler track shoes, one of the undercarriage parts of construction machinery, is a kind of vulnerable part of the construction machinery . Commonly used in excavators, bulldozers, crawler cranes, pavers and other construction machinery.


Most excavators use three rib track shoes, a few use flat bottom track shoes. In the design of three rib track shoes, first of all, the specific pressure of grounding and the meshing soil capacity between the reinforcement and the ground should be calculated to ensure the necessary adhesion; second, the track shoes should have high bending strength and wear resistance. Generally, the three rib track shoe has two mud cleaning holes. When the track shoe rotates around the driving wheel, the mud on the chain rail link can be removed automatically with the help of the gear teeth, so the mud cleaning hole should be located between the two screw holes that fix the track shoe on the chain rail link.


Technical Requirements Of Track Shoe Plate  PC200-2 PC200-5 PC200-7 PC200-8:

1.Heat treatment hardness: hb392-474

2.Trapezoid port R10, Q and m are allowed to have burr with height no more than 1.00.

3.The burr on both ends and hole diameter shall be clear and clean.

4.Color: according to customer requirements.

TRACK PAD  PC200-2 PC200-5 PC200-7 PC200-8

track shoe painting

MODELS OF TRACK SHOE OF KOMATSU EXCAVTORS:

PC100-1PC100-2PC100-3PC100-5PC100-6PC100L-3
PC100L-5PC100L-6PC100U-2PC100U-3PC1100-6PC1100LC-6
PC1100SP-6PC120-1PC120-5PC120-6PC120LC-6PC1250-7
PC1250SP-7PC128US-2PC128UU-1PC130-5PC130-6PC138 US
PC138US-2PC138USLC-2PC138USLC-8PC150-1PC150-3PC150HD-5
PC150LC-1PC150LC-3PC150LC-5PC150NHD-5PC160-6PC160LC-7
PC180LC-3PC180LC-5PC180LC-5KPC180LC-6KPC180LC-7PC180LLC-3
PC180LLC-5PC180NLC-3PC180NLC-3PC180NLC-6PC180NLC-7PC200-2
PC200-3PC200-5PC200-6PC200-7PC200-8PC200EL-6
PC200LC-3PC200LC-5PC200LC-6PC200LC-7PC200LC-8PC200NLC-7
PC210-3PC210-5PC210-7PC210-8PC210LC-5PC210LC-6
PC210LC-7PC210LC-8PC210NLC-7PC210NLC-8PC220-1PC220-1
PC220-2PC220-3PC220-5PC220-6PC220-7PC220LC-2
PC220LC-3PC220LC-5PC220LC-6PC220LC-7PC228US LC-3PC228UU-1
PC230-6PC230LC-6PC240-3PC240-5PC240-6PC240LC-3
PC240LC-5PC240LC-6PC240LC-7PC240LC-8PC250-6PC250LC-6
PC280LC-3PC290LC-6PC290NLC-7PC300-2PC300-3PC300-5
PC300-6PC300-7PC300-8PC300HD-3PC300HD-5PC300LC-3
PC300LC-5PC300LC-6PC300LC-7PC300LC-8PC300NLC-3PC300NLC-5
PC340-6PC340LC-7PC340NLC-6PC340NLC-7PC350-6PC350LC-6
PC350LC-7PC350LC-8PC360-7PC360LC-1PC360LC-3PC360LC-5
PC360LC-6PC380LC-6PC400-1PC400-3PC400-5PC400-6
PC400-7PC400-8PC400LC-8PC400HD-5PC400LC-1PC400LC-3
PC400LC-5PC400LC-6PC400LC-7PC450-6PC450-7PC450LC-6
PC60-1PC60-2PC60-3PC60-5PC60-6PC60-7
PC600LC-6PC600SE-6PC60LC-1PC60LC-2PC60LC-3PC60LC-5
PC60LC-6PC60U-1PC60U-5PC650-1PC650-3PC650-5
PC650LC-6PC650SE-5PC70-6PC710-5PC710SE-5PC750-6
PC750-7PC750LC-6PC750LC-7PC75UU-1PC75UU-2PC78MR-6
PC80-1PC80-3PC800-6PC800-6 AWPC800-7 W1PC800LC-8
PC800SE-6PC800SE-6 AWPC800SE-7 W1PC80LC-3PC90-1

FAQ

1. How Could You Know If Our Parts Are Fitted To Machines?

Please offer us the detailed machine models or mounting sizes.

2. How About The Payment Terms?

TT 30 percent deposit,and TT 70percent balance after seeing the scan copy of bill of lading or LC at sight.

3. What Is The Delivery Time?

Generally speaking, the delivery time is 20days to 45days.it depend on how many items for a order. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is within 10days.


Hot Tags: track shoe pc200-2 pc200-5 pc200-7 pc200-8, China, best, manufacturers, suppliers, factory, Excavator Track Shoe, Rubber Track Shoe Plate, Bulldozer Track Shoe, Swamp Track Shoe, Excavator Track Shoe Plate, Bulldozer Track Shoe Plate

You Might Also Like

(0/10)

clearall