
Track Shoe PC30 PC40-7 PC60-5 PC60-6
Hardness HCR38-42
Length:Standard or customerized
machine type:crawler tracked
Product Introduction
Track Shoe PC30 PC40-7 PC60-5 PC60-6
Production Introduction:
Crawler track shoes, one of the undercarriage parts of construction machinery, is a kind of vulnerable part of the construction machinery . Commonly used in excavators, bulldozers, crawler cranes, pavers and other construction machinery.
Processing method
The processing technology of track shoes for profiles is generally as follows: blanking, drilling (punching), heat treatment, straightening, painting and other processes are used; the track of bulldozer is single reinforced, and the paint color is yellow generally; the track of excavator is three reinforced, and the paint color is black generally. The material of the profile is generally 25mnb, and the final heat treatment hardness of the material is hcr38-42.
Technical Requirements Of Track Shoe Plate PC30 PC40-7 PC60-5 PC60-6:
1. Overall quenching hardness of heat treatment hrc38-42.
2. The Q surface of trapezoid interface is allowed to have burr with height no more than 1mm.
3. The plate warpage shall not be greater than 1mm in transverse direction and 1.5mm in longitudinal direction.
4. Color: according to customer requirements
TRACK PAD PC30 PC40-7 PC60-5 PC60-6

MODEL OF TRACK SHOE OF KOMATSU MINI EXCAVATORS.:
| PC03-1 | PC03-2 | PC05 | PC05-1 | PC05-2 |
| PC05-6 | PC05-7 | PC05R | PC07 | PC07-1 |
| PC07-2 | PC07-6 | PC07-7 | PC07R | PC08 |
| PC08U | PC08UU | PC08UU-1 | PC09 | PC09-1 |
| PC09FR | PC09FR-1 | PC10 | PC10-5 | PC10-6 |
| PC10-7 | PC10MR | PC10MR-1 | PC10R | PC10R-8 |
| PC10UU | PC10UU-3 | PC12 | PC12-1 | PC12-2 |
| PC12-2R | PC12R | PC12R-7UU | PC12R-8 | PC12UU |
| PC12UU-1 | PC12UU-2 | PC14 | PC14HS | PC14R-2 |
| PC15 | PC15-1 | PC15-2 | PC15-3 | PC15-6 |
| PC15-7 | PC15MR | PC15MR1 | PC15MRX | PC15P |
| PC15R | PC15R HS | PC15R-8 | PC16 | PC16HS |
| PC16R | PC16R2 | PC18 | PC18MR2 | PC20 |
| PC20-2 | PC20-5 | PC20-6 | PC20-7 | PC20-8 |
| PC20MR | PC20MR-1 | PC20MR2 | PC20MRX | PC20R |
| PC20R-8 | PC20UU | PC20UU-3 | PC25 | PC25-1 |
| PC25-2 | PC25-7 | PC25R | PC25R-8 | PC27 |
| PC27MR | PC27MR2 | PC27MRX | PC27R | PC27R-8 |
| PC28 | PC28-1 | PC28-2 | PC28R | PC28R-8 |
| PC28UU | PC28UU-1 | PC28UU-2 | PC28UU-3 | PC30 |
| PC30-5 | PC30-6 | PC30-7 | PC30-7E | PC30MR |
| PC30MR2 | PC30MR3 | PC30MRX | PC30R | PC30R-8 |
| PC30UU-3 | PC35 | PC35MR | PC35MR-1 | PC35MR-2 |
| PC35MR-3 | PC35MRX | PC35R | PC35R-8 | PC38 |
| PC38-1 | PC38-2 | PC38UU-1 | PC38UU-2 | PC38UU-3 |
| PC38UUM-2 | PC40 | PC40-1 | PC40-5 | PC40-6 |
| PC40-7 | PC40MR | PC40MR-1 | PC40MR-2 | PC40MRX |
| PC40R | PC40R-8 | PC45 | PC45-1 | PC45-1E |
| PC45-7 | PC45-R | PC45MR-1 | PC45MR-2 | PC45MRX |
| PC45R-8 | PC50 | PC50-1 | PC50-2 | PC50-3 |
| PC50FR-2 | PC50M-2 | PC50MR | PC50MR-1 | PC50MR-2 |
| PC50UU | PC50UU-1 | PC50UU-2 | PC50UU-2E | PC50UU-3 |
| PC50UUM-2 | PC58 | PC60 | PC60-5 | PC60-6 |
| PC60-7 | PC60-8 | PC70 | PC70-7 | PC70FR-1 |
| PC75 | PC75-1 | PC75-2 | PC75-6 | PC75MR6 |
| PC75R | PC75R-2 | PC75R-8 | PC75U-1 | PC75UU |
| PC75UU-1 | PC75UU-2 | PC75UU-3 | PC78MR6 | PC78US-5 |
| PC78US-6 | PC88MR6 | PC95 |
FAQ
1. What Is The Delivery Time?
Generally speaking, the delivery time is 20days to 45days.it depend on how many items for a order. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is within 10days.
2. What Is MOQ For The Order?
Generally speaking, the MOQ is a full container load of 20 feet container. Under this condition, the single cost can be lowered. if customers ask for less full container load. It is also acceptable.
3. How Can You Control Your Quality?
When material come inside our factory, we need to analyze the material cost. And when front idlers and sprocket rims material are casted. We need to analyze the composition to see if the material is qualified or not. When track rollers, carrier rollers and front idlers are being assembled, we need to oil leakage testing. After several parts are heat treated, we need to check the hardness before all are done.And our inspectors will check the sizes at ramdom when parts are being machined or assembled. All of these can guarantee the parts with correct sizes and good quality.
Hot Tags: track shoe pc30 pc40-7 pc60-5 pc60-6, China, best, manufacturers, suppliers, factory, Excavator Track Shoe Plate, Swamp Track Shoe, Bulldozer Track Shoe, Excavator Track Shoe, Bulldozer Track Shoe Plate, Rubber Track Shoe Plate
You Might Also Like
Send Inquiry







