
Vio17 Excavator Lower Roller
Color:Black or customerized
Hardness:HRC52-HCR58
Guarantee:6months
Product Introduction
vio17 excavator lower roller
INTRODUCTION OF PRODUCTS:
The excavator lower roller body materials are generally 50Mn, 40Mn2, etc. the main process is casting or forging, machining, and then heat treatment. The hardness of the wheel surface after quenching should reach hrc52 ~ 58 to increase the wear resistance of the wheel surface. The machining accuracy of the roller axle is required to be high, generally it needs to be processed by numerical control machine to meet the requirements. There are more materials of 40Mn2, and quenching heat treatment should be carried out after processing. And the sliding bearing support and floating oil seal are used to prevent dust. The advantage of doing this is: generally, only one time of butter is added in an overhaul period, which simplifies the routine maintenance of the excavator.

|
Models Available For Yanmar Excavators: VIO15,VIO17,VIO18,VIO20,VIO30-1,VIO30-2,VIO35,VIO40-1,VIO40-2,VIO50-2,VIO50-6,VIO70,VIO75,VIO55-2,VIO55-6,B17,B27,B37,B50 ETC..
Technical requirements: 1: Before assembly, all parts shall be inspected and cleaned separately; 2: During assembly, the assembly size shall be ensured; 3: The sealing surface of shaft sleeve, shaft and floating seal ring shall be coated with lubricating oil; 4: The contact surface between O-ring and floating seal ring shall be free of lubricating oil, The O-ring assembly shall be free of distortion; 5: After assembly, ensure that the wheel body can be rotated by hand without jamming; 6: After assembly, pressure test and oil filling shall be carried out; 7: After assembly, polish, polish and remove welding slag. |

FAQ
1. How About The Payment Terms?
TT 30 percent deposit,and TT 70percent balance after seeing the scan copy of bill of lading or LC at sight.
2. What Is The Delivery Time?
Generally speaking, the delivery time is 30 days. But if the whole order are 200 serial track roller(bottom roller, lower roller), the delivery time is from 10-15 days.
3. What Is MOQ For The Order?
FCL and LCL are both acceptable.
4. How Can You Control Your Quality?
When material come inside our factory, we need to analyze the material cost. And our inspectors will check the sizes at random when parts are being machined or assembled. All of these can guarantee the parts with correct sizes and good quality.
Hot Tags: vio17 excavator lower roller, China, best, manufacturers, suppliers, factory, Yanmar Carrier Roller, Track Roller IHI18, Track Roller JS200, Front Idler KX161 3, Track Adjuster Assy, Front Idler PC200 2
You Might Also Like
Send Inquiry







